Northwest Park Aquatic Facility
๐Project Metrics
TDLR #TABS2024014690Review Complete
Design review complete, construction may proceed
๐Scope of Work
Renovate existing pool, pool support facilities such as toilet rooms, and update site for accessibility compliance.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$16.0M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Changing tubs to showers in master and guest bathroom. Replacing toilets. Replacing lavatory in guest bathroom. Replacing water heater. Replacing shower valves.
Replacement of complete existing central heat and air system with or without duct work
Upgrade electrical service to 150A and coordinate with framers on removing and replacing siding replace interior plugs and switches throughout the houseinstall wired smoke detectors
Express:1)Remove the storm door2) Remove the existing siding from the exterior walls3) Remove all of the existing windows including the greenhouse bay window4) Install sheathing to the new wall framing on the living room windows5) Install insulation and drywall to the framing on the living room windows6) Install synthetic underlayment to cover all of the siding wall7) Install the new sliding glass door8) Install new Pella white vinyl windows9) Install new 8-inch Hardie lap siding to the exterior of the home10) Paint exterior of the entire house excluding the brick11) Run nail magnet around the entire perimeter of the roof and around the yard12) Remove all related debris from site
EMERGENCY REQUEST - Pulled gas meter. Repair leaks on gas system. Replace 50 gallon gas water heater. Gas pressure test.
๐Related Site Plans
City of Austin site plan approvals at this location