Project intelligenceTDLR TABS2024014704New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Jarrell ISD | New Operations Center

1247 C Bud Stockton L Loop, Jarrell, TX, 76537

Construction complete · Feb 2026Project Closed

Jarrell ISD | New Operations Center is a new construction project at 1247 C Bud Stockton L Loop, Jarrell, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $13.4M across about 28,249 sq ft.

Estimated project value
$13.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
28,249 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$474/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 26, 2024697 days across supplied datesFeb 21, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    420 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    218 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76537 (Jarrell)

One email per change. Unsubscribe in one click. Privacy.

Jarrell ISD | New Operations Center is a New Construction project located at 1247 C Bud Stockton L Loop, Jarrell, TX 76537 in Jarrell, Texas. The project has an estimated value of $13.4M covering 28,249 sq ft. Jarrell ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on March 26, 2024.

Frequently Asked Questions

What is Jarrell ISD | New Operations Center?

Jarrell ISD | New Operations Center is a new construction project at 1247 C Bud Stockton L Loop in Jarrell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Jarrell ISD | New Operations Center

Is Jarrell ISD | New Operations Center open in Jarrell?

Construction on Jarrell ISD | New Operations Center is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.

Where is Jarrell ISD | New Operations Center located?

Jarrell ISD | New Operations Center is located at 1247 C Bud Stockton L Loop, Jarrell, TX, 76537, in Williamson County.

Who is the owner or developer of Jarrell ISD | New Operations Center?

Jarrell ISD is the property owner/developer of record for Jarrell ISD | New Operations Center, per its TDLR project registration.

Who is the architect or design firm for Jarrell ISD | New Operations Center?

Huckabee is the design firm of record for Jarrell ISD | New Operations Center, according to its TDLR filing.

How much does Jarrell ISD | New Operations Center cost and how big is it?

Jarrell ISD | New Operations Center has an estimated construction value of $13.4M and approximately 28,249 square feet (about $474/sqft), based on its TDLR filing.

Scope of Work

Jarrell ISD | New Operations Center

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1247 C Bud Stockton L Loop, Jarrell, TX, 76537

Location by street address

Related City Permits

Building permits found at or near this location

12473 Fairfax Ridge Place T 00000

New Sf Res Electric Only Eud

FinalElectrical PermitRemodelAug 1998
View Details
1998-002114 EP
12473 Fairfax Ridge Place T 00000

New Sf Res Electric Only Eud

FinalMechanical PermitRemodelAug 1998
View Details
1998-002114 MP
12472 Fairfax Ridge Place T 00000

New Residence Service Only (Eud)

FinalElectrical PermitRemodelMar 1998
View Details
1998-006905 EP
12472 Fairfax Ridge Place T 00000

New Residence Service Only (Eud)

FinalMechanical PermitRemodelMar 1998
View Details
1998-006905 MP
12473 Fairfax Ridge Place T 00000

New Residence Service Only (Eud)

ExpiredMechanical PermitRemodelMar 1998
View Details
1998-006895 MP

Watch all construction in 76537 (Jarrell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.