Project intelligenceTDLR TABS2024014753Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Playground Rubberized Surfacing at Curington ES in Boerne, TX

601 Adler Road, Boerne, TX, 78006

Construction complete · Aug 2024Project Closed

Playground Rubberized Surfacing at Curington ES is a renovation/alteration project at 601 Adler Road, Boerne, in Kendall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $278K across about 22,827 sq ft.

Estimated project value
$278K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,827 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 27, 2024135 days across supplied datesAug 9, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78006 (Boerne)

One email per change. Unsubscribe in one click. Privacy.

Playground Rubberized Surfacing at Curington ES is a Renovation/Alteration project located at 601 Adler Road, Boerne, TX 78006 in Boerne, Texas. The project has an estimated value of $278K covering 22,827 sq ft. Boerne ISD is the property owner and MTR Engineers is the design firm of record. The project was registered with TDLR on March 27, 2024.

Frequently Asked Questions

What is Playground Rubberized Surfacing at Curington ES?

Playground Rubberized Surfacing at Curington ES is a renovation/alteration project at 601 Adler Road in Boerne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demo of existing wood fiber section at upper and lower level playgrounds, new rubberized surface section and associated drainage.

Is Playground Rubberized Surfacing at Curington ES open in Boerne?

Construction on Playground Rubberized Surfacing at Curington ES is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is Playground Rubberized Surfacing at Curington ES located?

Playground Rubberized Surfacing at Curington ES is located at 601 Adler Road, Boerne, TX, 78006, in Kendall County.

Who is the owner or developer of Playground Rubberized Surfacing at Curington ES?

Boerne ISD is the property owner/developer of record for Playground Rubberized Surfacing at Curington ES, per its TDLR project registration.

Who is the architect or design firm for Playground Rubberized Surfacing at Curington ES?

MTR Engineers is the design firm of record for Playground Rubberized Surfacing at Curington ES, according to its TDLR filing.

How much does Playground Rubberized Surfacing at Curington ES cost and how big is it?

Playground Rubberized Surfacing at Curington ES has an estimated construction value of $278K and approximately 22,827 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Demo of existing wood fiber section at upper and lower level playgrounds, new rubberized surface section and associated drainage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

601 Adler Road, Boerne, TX, 78006

Loading location map…
29.80459, -98.72659

Watch all construction in 78006 (Boerne)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.