Project intelligenceTDLR TABS2024015310Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Northside High School Area Drainage and Paving

1116 Luzon St, Houston, TX, 77009

Opening ~Dec 2028Review Complete

Northside High School Area Drainage and Paving is a renovation/alteration project at 1116 Luzon St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2028. The project has an estimated value of $11.3M across about 149,979 sq ft.

Estimated project value
$11.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
149,979 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$75/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 3, 20241,717 days across supplied datesDec 15, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    454 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,263 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77009 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Northside High School Area Drainage and Paving is a Renovation/Alteration project located at 1116 Luzon St, Houston, TX 77009 in Houston, Texas. The project has an estimated value of $11.3M covering 149,979 sq ft. City of Houston is the property owner and PGAL is the design firm of record. The project was registered with TDLR on April 3, 2024.

Frequently Asked Questions

What is Northside High School Area Drainage and Paving?

Northside High School Area Drainage and Paving is a renovation/alteration project at 1116 Luzon St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Proposed Curb, pavement, wheel chair ramps and sidewalks

Is Northside High School Area Drainage and Paving open in Houston?

Northside High School Area Drainage and Paving is still under construction in Houston, TX, with an estimated completion of Dec 2028 according to its TDLR registration.

Where is Northside High School Area Drainage and Paving located?

Northside High School Area Drainage and Paving is located at 1116 Luzon St, Houston, TX, 77009, in Harris County.

Who is the owner or developer of Northside High School Area Drainage and Paving?

City of Houston is the property owner/developer of record for Northside High School Area Drainage and Paving, per its TDLR project registration.

Who is the architect or design firm for Northside High School Area Drainage and Paving?

PGAL is the design firm of record for Northside High School Area Drainage and Paving, according to its TDLR filing.

How much does Northside High School Area Drainage and Paving cost and how big is it?

Northside High School Area Drainage and Paving has an estimated construction value of $11.3M and approximately 149,979 square feet (about $75/sqft), based on its TDLR filing.

Scope of Work

Proposed Curb, pavement, wheel chair ramps and sidewalks

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 77009 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Harris

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists