Project intelligenceTDLR TABS2024016232Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Willowridge High School Facade Upgrades in Houston, TX

16301 Chimney Rock Rd., Houston, TX, 77053

Target date passed (Jul 2025)Review Complete

Willowridge High School Facade Upgrades is a renovation/alteration project at 16301 Chimney Rock Rd., Houston, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.3M across about 243,490 sq ft.

Estimated project value
$6.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
243,490 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$26/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 2024472 days across supplied datesJul 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    230 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77053 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Willowridge High School Facade Upgrades is a Renovation/Alteration project located at 16301 Chimney Rock Rd., Houston, TX 77053 in Houston, Texas. The project has an estimated value of $6.3M covering 243,490 sq ft. Fort Bend ISD is the property owner and PBK is the design firm of record. The project was registered with TDLR on April 15, 2024.

Frequently Asked Questions

What is Willowridge High School Facade Upgrades?

Willowridge High School Facade Upgrades is a renovation/alteration project at 16301 Chimney Rock Rd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sitework improvements including replacement of parking lots, re-striping, various concrete repairs, ADA ramp replacements and additions, and entry facade upgrades.

Is Willowridge High School Facade Upgrades open in Houston?

Willowridge High School Facade Upgrades was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Willowridge High School Facade Upgrades located?

Willowridge High School Facade Upgrades is located at 16301 Chimney Rock Rd., Houston, TX, 77053, in Fort Bend County.

Who is the owner or developer of Willowridge High School Facade Upgrades?

Fort Bend ISD is the property owner/developer of record for Willowridge High School Facade Upgrades, per its TDLR project registration.

Who is the architect or design firm for Willowridge High School Facade Upgrades?

PBK is the design firm of record for Willowridge High School Facade Upgrades, according to its TDLR filing.

How much does Willowridge High School Facade Upgrades cost and how big is it?

Willowridge High School Facade Upgrades has an estimated construction value of $6.3M and approximately 243,490 square feet (about $26/sqft), based on its TDLR filing.

Scope of Work

Sitework improvements including replacement of parking lots, re-striping, various concrete repairs, ADA ramp replacements and additions, and entry facade upgrades.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

16301 Chimney Rock Rd., Houston, TX, 77053

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

16301 CHIMNEY ROCK RD, Houston, TX 77053

SCHOOL EXTERIOR LIGHTING UPGRADE 2021 IBC

IssuedBuilding PmtJun 2026
HOU-25110016-BUILDINGPMT
16301 CHIMNEY ROCK RD, Houston, TX 77053

SOFT/BASE BALL TURF INSTALL W/SITE IMPRVMNTS 21 IBC

IssuedBuilding PmtMay 2026
HOU-26002659-BUILDINGPMT
16301 CHIMNEY ROCK RD, Houston, TX 77053

11,238SF/SCHOOL ADDITION/REMODEL/SITEWORK/1-2-2-E-A/SPR/OL/21 IBC

IssuedBuilding PmtMay 2026
HOU-25093321-BUILDINGPMT

Watch all construction in 77053 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.