Funding type
This project is privately funded, on private land for private use.
Willowridge High School Facade Upgrades in Houston, TX
16301 Chimney Rock Rd., Houston, TX, 77053
Willowridge High School Facade Upgrades is a renovation/alteration project at 16301 Chimney Rock Rd., Houston, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.3M across about 243,490 sq ft.
- Estimated project value
- $6.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 243,490 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $26/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
242 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
230 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77053 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Willowridge High School Facade Upgrades is a Renovation/Alteration project located at 16301 Chimney Rock Rd., Houston, TX 77053 in Houston, Texas. The project has an estimated value of $6.3M covering 243,490 sq ft. Fort Bend ISD is the property owner and PBK is the design firm of record. The project was registered with TDLR on April 15, 2024.
Frequently Asked Questions
What is Willowridge High School Facade Upgrades?
Willowridge High School Facade Upgrades is a renovation/alteration project at 16301 Chimney Rock Rd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sitework improvements including replacement of parking lots, re-striping, various concrete repairs, ADA ramp replacements and additions, and entry facade upgrades.
Is Willowridge High School Facade Upgrades open in Houston?
Willowridge High School Facade Upgrades was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Willowridge High School Facade Upgrades located?
Willowridge High School Facade Upgrades is located at 16301 Chimney Rock Rd., Houston, TX, 77053, in Fort Bend County.
Who is the owner or developer of Willowridge High School Facade Upgrades?
Fort Bend ISD is the property owner/developer of record for Willowridge High School Facade Upgrades, per its TDLR project registration.
Who is the architect or design firm for Willowridge High School Facade Upgrades?
PBK is the design firm of record for Willowridge High School Facade Upgrades, according to its TDLR filing.
How much does Willowridge High School Facade Upgrades cost and how big is it?
Willowridge High School Facade Upgrades has an estimated construction value of $6.3M and approximately 243,490 square feet (about $26/sqft), based on its TDLR filing.
Scope of Work
Sitework improvements including replacement of parking lots, re-striping, various concrete repairs, ADA ramp replacements and additions, and entry facade upgrades.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
16301 Chimney Rock Rd., Houston, TX, 77053
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$47.53B totalRelated City Permits
Building permits found at or near this location
SCHOOL EXTERIOR LIGHTING UPGRADE 2021 IBC
SOFT/BASE BALL TURF INSTALL W/SITE IMPRVMNTS 21 IBC
11,238SF/SCHOOL ADDITION/REMODEL/SITEWORK/1-2-2-E-A/SPR/OL/21 IBC
Watch all construction in 77053 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.