Project intelligenceTDLR TABS2024017885Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Additions & Renovations Phase Il for Holliday Independent School District

751 College Ave, Holliday, TX, 75366

Construction complete · Sep 2026Inspection Complete

Additions & Renovations Phase Il for Holliday Independent School District is a additions to existing building project at 751 College Ave, Holliday, in Archer County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $7.3M across about 21,637 sq ft.

Estimated project value
$7.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
21,637 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$337/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 6, 2024876 days across supplied datesSep 29, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    487 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    363 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Additions & Renovations Phase Il for Holliday Independent School District

The Holliday ISD Campus at 751 College Ave in Holliday, Texas, completed its Additions & Renovations Phase II project. This construction effort added 21,637 square feet of new space, specifically a cafeteria and additional classrooms, to the existing facility. The project cost $7,300,000, resulting in a calculated cost of $337 per square foot. Construction began in June 2024 after plan review was finalized in May 2024. The building passed its final TDLR accessibility inspection in September 2026, confirming that the construction phase is complete.

Harper Perkins Architects, Inc. served as the design firm of record for this expansion of the Holliday ISD Campus. The registered accessibility specialist for the project was Sharlynn L Keys. The work was categorized as additions to an existing building, focusing on expanding educational and dining capacity within Archer County. The project utilized public funds and public land, consistent with standard school district developments in the region.

Project Scope and Financials

The filing details a scope of work that included new additions for a cafeteria and classrooms. The total square footage added was 21,637 sq ft. With an estimated cost of $7,300,000, the project represents a significant investment in local infrastructure. The cost per square foot of $337 reflects the scope of the renovation and addition work undertaken during the 2024 to 2026 timeline. The construction start date was June 2024, and the final inspection was passed in September 2026, marking the end of the active construction period for this Holliday ISD Campus project.

Holliday Independent School District has four other TDLR-registered projects totaling $13,900,000. These include other campus improvements and an agricultural building, all located in Holliday. The district’s recent activity shows a sustained focus on facility upgrades. Harper Perkins Architects, Inc. has six other TDLR-registered projects totaling $10,900,000 across various Texas locations, including Graham, Gordon, Montague, and Wichita Falls. This indicates a broad portfolio of educational and public facility work for both the owner and the design firm.

The project status is listed as Inspection Complete. The TDLR registration occurred in May 2024, and plan review was completed in the same month. Construction started in June 2024, and the final TDLR accessibility inspection was passed in September 2026. The completion date on the filing was October 2025, but the inspection pass date confirms the project’s final regulatory status. The Archer County unemployment rate was 3.9 percent in July 2026, according to FRED data, providing context for the local labor market during the project’s final phase.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75366 (Holliday)

One email per change. Unsubscribe in one click. Privacy.

Additions & Renovations Phase Il for Holliday Independent School District is a Additions to Existing Building project located at 751 College Ave, Holliday, TX 75366 in Holliday, Texas. The project has an estimated value of $7.3M covering 21,637 sq ft. Holliday Independent School District is the property owner and Harper Perkins Architects, Inc. is the design firm of record. The project was registered with TDLR on May 6, 2024.

Frequently Asked Questions

When did construction start?

Construction started in June 2024, following the completion of plan review in May 2024.

What was the total square footage added?

The project added 21,637 square feet of new space, including a cafeteria and classrooms.

Who is the design firm?

Harper Perkins Architects, Inc. is the design firm of record for this project.

What is the current project status?

The project status is Inspection Complete, with the final TDLR accessibility inspection passed in September 2026.

What is Additions & Renovations Phase Il for Holliday Independent School District?

Additions & Renovations Phase Il for Holliday Independent School District is a additions to existing building project at 751 College Ave in Holliday, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Additions (Cafeteria and Classrooms) 21,637sq ft

Is Additions & Renovations Phase Il for Holliday Independent School District open in Holliday?

Construction on Additions & Renovations Phase Il for Holliday Independent School District is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Additions & Renovations Phase Il for Holliday Independent School District located?

Additions & Renovations Phase Il for Holliday Independent School District is located at 751 College Ave, Holliday, TX, 75366, in Archer County.

Who is the owner or developer of Additions & Renovations Phase Il for Holliday Independent School District?

Holliday Independent School District is the property owner/developer of record for Additions & Renovations Phase Il for Holliday Independent School District, per its TDLR project registration.

Who is the architect or design firm for Additions & Renovations Phase Il for Holliday Independent School District?

Harper Perkins Architects, Inc. is the design firm of record for Additions & Renovations Phase Il for Holliday Independent School District, according to its TDLR filing.

How much does Additions & Renovations Phase Il for Holliday Independent School District cost and how big is it?

Additions & Renovations Phase Il for Holliday Independent School District has an estimated construction value of $7.3M and approximately 21,637 square feet (about $337/sqft), based on its TDLR filing.

Scope of Work

New Additions (Cafeteria and Classrooms) 21,637sq ft

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

751 College Ave, Holliday, TX, 75366

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75366 (Holliday)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Holliday?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.