RRC2012-MP78.63-Bridge Walkway - Phase 2
RRC2012-MP78.63-Bridge Walkway - Phase 2 is a renovation/alteration project at CapMetro Rail Bridge at Brushy Creek (30°30'14.4"N 97°47'03.0"W), Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $1.5M across about 2,500 sq ft.
📊Project Metrics
TDLR #TABS2024018346Project Registered
Project has been registered with TDLR and is in pre-construction phase
RRC2012-MP78.63-Bridge Walkway - Phase 2 is a Renovation/Alteration project located at CapMetro Rail Bridge at Brushy Creek (30°30'14.4"N 97°47'03.0"W), Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $1.5M covering 2,500 sq ft. Capital Metropolitan Transportation Authority is the property owner and AECOM Technical Services, Inc. is the design firm of record. The project was registered with TDLR on May 13, 2024.
❓Frequently Asked Questions
What is RRC2012-MP78.63-Bridge Walkway - Phase 2?
RRC2012-MP78.63-Bridge Walkway - Phase 2 is a renovation/alteration project at CapMetro Rail Bridge at Brushy Creek (30°30'14.4"N 97°47'03.0"W) in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of switchback walkway from emergency refuge area constructed in phase 1 of project. Grading at bottom of switchback walkway to park area.
Is RRC2012-MP78.63-Bridge Walkway - Phase 2 open in Cedar Park?
RRC2012-MP78.63-Bridge Walkway - Phase 2 is still under construction in Cedar Park, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is RRC2012-MP78.63-Bridge Walkway - Phase 2 located?
RRC2012-MP78.63-Bridge Walkway - Phase 2 is located at CapMetro Rail Bridge at Brushy Creek (30°30'14.4"N 97°47'03.0"W), Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of RRC2012-MP78.63-Bridge Walkway - Phase 2?
Capital Metropolitan Transportation Authority is the property owner/developer of record for RRC2012-MP78.63-Bridge Walkway - Phase 2, per its TDLR project registration.
Who is the architect or design firm for RRC2012-MP78.63-Bridge Walkway - Phase 2?
AECOM Technical Services, Inc. is the design firm of record for RRC2012-MP78.63-Bridge Walkway - Phase 2, according to its TDLR filing.
How much does RRC2012-MP78.63-Bridge Walkway - Phase 2 cost and how big is it?
RRC2012-MP78.63-Bridge Walkway - Phase 2 has an estimated construction value of $1.5M and approximately 2,500 square feet (about $612/sqft), based on its TDLR filing.
📋Scope of Work
Addition of switchback walkway from emergency refuge area constructed in phase 1 of project. Grading at bottom of switchback walkway to park area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📅Project Timeline
Filed
May 13, 2024
Review Complete
Inspection Complete
Closed