Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Plaza Saltillo Station Double Track and Trail Project in Austin, TX
1501 E 5th St 170 Bolton Dr, Austin, TX, 78702
Plaza Saltillo Station Double Track and Trail Project is a renovation/alteration project at 1501 E 5th St 170 Bolton Dr, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2028. The project has an estimated value of $40.6M across about 2,944 sq ft.
- Estimated project value
- $40.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,944 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13.80K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
351 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
366 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Plaza Saltillo Station Double Track and Trail Project
Cap Metro Plaza Saltillo Station is undergoing a major renovation at 1501 E 5th St 170 Bolton Dr in Austin, Texas. The project, filed as the Plaza Saltillo Station Double Track and Trail Project, converts the existing single-track light rail line into a double-track configuration. This Capital Metropolitan Transportation Authority initiative includes the construction of new passenger platforms and canopies, along with associated utility relocations and right-of-way flatwork. The total covered area under the four new canopies measures 2,944 square feet.
Registered with the Texas Department of Licensing and Regulation (TDLR) in June 2026, the project is in the plan review phase. Construction is scheduled to begin in June 2027, with completion targeted for June 2028. The estimated cost for this renovation/alteration work is $40,615,944. This figure places the project in the top quarter of estimated costs for similar renovation and alteration filings in Travis County, where the median estimated cost is $297,842.
HNTB Corporation serves as the design firm of record for this infrastructure upgrade. The project involves public funds and public land, reflecting its role in the regional transit network. The project is part of a broader portfolio of Capital Metropolitan Transportation Authority initiatives, which includes six other TDLR-registered projects totaling $142,274,000 across Austin and Cedar Park.
Project Scope and Context
The scope of work focuses on enhancing capacity and passenger experience at the Saltillo Station. By doubling the track, the project supports increased service frequency and operational flexibility for the Cap Metro system. The addition of platforms and canopies provides dedicated waiting areas for riders. The total square footage of 2,944 sq ft is relatively small compared to the median size of 3,800 sq ft for similar projects in the county, but the cost per square foot of $13,796 is significantly higher than the county median of $103 per square foot. This reflects the specialized nature of rail infrastructure work versus general building renovations.
The scheduled build window of 366 days is longer than the county median of 98 days for renovation and alteration projects. This extended timeline is consistent with the complexity of double-tracking an active rail line and coordinating utility relocations. The project’s registration status is "Project Registered," indicating that the initial filing has been accepted and the plan review process is underway. The involvement of a registered accessibility specialist, Jesus E Lardizabal, ensures that the new platforms and facilities meet required accessibility standards.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78702 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Plaza Saltillo Station Double Track and Trail Project is a Renovation/Alteration project located at 1501 E 5th St 170 Bolton Dr, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $40.6M covering 2,944 sq ft. Capital Metropolitan Transportation Authority is the property owner and HNTB Corporation is the design firm of record. The project was registered with TDLR on June 15, 2026.
Frequently Asked Questions
When will the Plaza Saltillo Station renovation be finished?
Completion is targeted for June 2028. Construction is scheduled to start in June 2027, following the current plan review phase which began after registration in June 2026.
What is the estimated cost of the double track project?
The estimated cost is $40,615,944. This amount covers the change from single to double track, new platforms, canopies, and utility relocations.
Who is the owner and design firm for this project?
The Capital Metropolitan Transportation Authority is the owner of record. HNTB Corporation is the design firm of record responsible for the project plans.
Is the station open to the public during construction?
The project is in the plan review and pre-construction phase. Construction has not started yet, as it is scheduled to begin in June 2027.
How large is the new covered area at the station?
The total area under the four new canopies is 2,944 square feet. This space is designated for passenger waiting areas.
What is Plaza Saltillo Station Double Track and Trail Project?
Plaza Saltillo Station Double Track and Trail Project is a renovation/alteration project at 1501 E 5th St 170 Bolton Dr in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Change from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. Total 2944 SF under 4 canopies
Is Plaza Saltillo Station Double Track and Trail Project open in Austin?
Plaza Saltillo Station Double Track and Trail Project is still under construction in Austin, TX, with an estimated completion of Jun 2028 according to its TDLR registration.
Where is Plaza Saltillo Station Double Track and Trail Project located?
Plaza Saltillo Station Double Track and Trail Project is located at 1501 E 5th St 170 Bolton Dr, Austin, TX, 78702, in Travis County.
Who is the owner or developer of Plaza Saltillo Station Double Track and Trail Project?
Capital Metropolitan Transportation Authority is the property owner/developer of record for Plaza Saltillo Station Double Track and Trail Project, per its TDLR project registration.
Who is the architect or design firm for Plaza Saltillo Station Double Track and Trail Project?
HNTB Corporation is the design firm of record for Plaza Saltillo Station Double Track and Trail Project, according to its TDLR filing.
How much does Plaza Saltillo Station Double Track and Trail Project cost and how big is it?
Plaza Saltillo Station Double Track and Trail Project has an estimated construction value of $40.6M and approximately 2,944 square feet (about $13.80K/sqft), based on its TDLR filing.
Scope of Work
Change from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. Total 2944 SF under 4 canopies
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1501 E 5th St 170 Bolton Dr, Austin, TX, 78702
Related Projects
Same Owner
$304.8M totalSame Design Firm
$353.9M totalRelated City Permits
Building permits found at or near this location
New Bicycle Shelter (AKA 1501 E 5th 412 Comal)
New Bicycle Shelter (AKA 1501 E 5th 412 Comal)
Repairing gas leak to existing residence only
Cap off water and waste water
Total demo of a commercial warehouse circa 1940s approx. 6515 sf
Related Site Plans
City of Austin site plan approvals at this location
Watch all construction in 78702 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.