Project intelligenceTDLR TABS2025015574New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 741 (CSJ: 1092-01-021, etc.) in Kaufman, TX

From: US 175 To: FM 548, Kaufman, TX, 75142

Opening ~Dec 2032Review Complete

FM 741 (CSJ: 1092-01-021, etc.) is a new construction project at From: US 175 To: FM 548, Kaufman, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2032. The project has an estimated value of $219.0M across about 575,609 sq ft.

Estimated project value
$219.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
575,609 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$380/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 1, 20252,801 days across supplied datesDec 1, 2032

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,705 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,096 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FM 741 (CSJ: 1092-01-021, etc.)

TxDOT District: Dallas is reconstructing and widening FM 741 in Kaufman County under project CSJ: 1092-01-021, etc. The estimated cost is $218,970,233. The work transforms a two-lane rural undivided highway into a four- or six-lane urban divided roadway between US 175 and FM 548. This major infrastructure upgrade is scheduled to finish in December 2032, with construction starting in December 2029.

The scope includes specific accessibility improvements mandated by the filing. A 6-foot sidewalk will be built on the northbound side, while a 10-foot shared-use path will run along the southbound side. These pedestrian and cyclist amenities will be connected by crosswalks and ADA ramps, ensuring safe access across the new lanes. The project covers a total area of 575,609 sq ft, resulting in a computed cost of $380 per square foot.

Project Management and Funding

HNTB Corporation serves as the design firm of record for this federally funded roadway project. Frank Fonseca is the registered accessibility specialist listed on the TDLR filing. The project was registered with the Texas Department of Licensing and Regulation in April 2025, and plan review was completed in the same month. The TDLR status is Review Complete, confirming that the regulatory prerequisites for construction have been met.

This project is significantly larger than typical new construction filings in Kaufman County. The estimated cost is in the top quarter of the 659 comparable TDLR-registered new construction projects in the county. The scheduled build window of 1,096 days is longer than the county median of 242 days. Additionally, the $380 per square foot cost exceeds the county median of $146 per square foot for similar new construction work.

TxDOT District: Dallas has six other TDLR-registered projects totaling $60,982,724. HNTB Corporation has six other TDLR-registered projects totaling $686,078,692. The area profile for ZIP 75142 shows a population of about 23,301 and a median household income of $78,301. Housing in the area is predominantly owner-occupied, with a median home value of $208,900.

Local Context and Labor Market

Kaufman County’s unemployment rate was 4.7 percent in August 2026, which is lower than a year earlier. This economic stability supports the large-scale labor requirements for a project of this magnitude. The project is one of several new construction developments in the immediate area, including Kemp Junior High School and Broadstreet Bank. The scale of the FM 741 reconstruction reflects a significant investment in regional connectivity and accessibility infrastructure for Kaufman County residents and commuters.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75142 (Kaufman)

One email per change. Unsubscribe in one click. Privacy.

FM 741 (CSJ: 1092-01-021, etc.) is a New Construction project located at From: US 175 To: FM 548 in Kaufman, Texas. The project has an estimated value of $219.0M covering 575,609 sq ft. TxDOT District: Dallas is the property owner and HNTB Corporation is the design firm of record. The project was registered with TDLR on April 1, 2025.

Frequently Asked Questions

When is the FM 741 project scheduled to finish?

The project is scheduled to finish in December 2032. Construction is set to begin in December 2029, following the completion of TDLR plan review in April 2025.

What is the estimated cost of this road reconstruction?

The estimated cost is $218,970,233. This figure is above the county median for new construction projects and reflects the scale of widening a rural road to an urban divided highway.

Who is the design firm for this project?

HNTB Corporation is the design firm of record. Frank Fonseca is the registered accessibility specialist listed on the TDLR filing for this project.

What accessibility features are included in the scope?

The scope includes a 6-foot sidewalk northbound and a 10-foot shared-use path southbound. These are connected by crosswalks and ADA ramps to ensure accessible movement.

Is the project located in a flood zone?

It is designated as zone X according to the FEMA National Flood Hazard Layer.

What is FM 741 (CSJ: 1092-01-021, etc.)?

FM 741 (CSJ: 1092-01-021, etc.) is a new construction project at From: US 175 To: FM 548 in Kaufman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen 2 lane rural undivided to 4/6 lane urban divided. Improvements include a 6' sidewalk northbound and a 10' Shared use path southbound with crosswalks and ADA ramps.

Is FM 741 (CSJ: 1092-01-021, etc.) open in Kaufman?

FM 741 (CSJ: 1092-01-021, etc.) is still under construction in Kaufman, TX, with an estimated completion of Dec 2032 according to its TDLR registration.

Where is FM 741 (CSJ: 1092-01-021, etc.) located?

FM 741 (CSJ: 1092-01-021, etc.) is located at From: US 175 To: FM 548, Kaufman, TX, 75142, in Kaufman County.

Who is the owner or developer of FM 741 (CSJ: 1092-01-021, etc.)?

TxDOT District: Dallas is the property owner/developer of record for FM 741 (CSJ: 1092-01-021, etc.), per its TDLR project registration.

Who is the architect or design firm for FM 741 (CSJ: 1092-01-021, etc.)?

HNTB Corporation is the design firm of record for FM 741 (CSJ: 1092-01-021, etc.), according to its TDLR filing.

How much does FM 741 (CSJ: 1092-01-021, etc.) cost and how big is it?

FM 741 (CSJ: 1092-01-021, etc.) has an estimated construction value of $219.0M and approximately 575,609 square feet (about $380/sqft), based on its TDLR filing.

Scope of Work

Reconstruct and widen 2 lane rural undivided to 4/6 lane urban divided. Improvements include a 6' sidewalk northbound and a 10' Shared use path southbound with crosswalks and ADA ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: US 175 To: FM 548, Kaufman, TX, 75142

Loading location map…
32.60164, -96.33751