Project intelligenceTDLR TABS2024018771New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

New CTE & Maintenance Buildings (2) in Yoakum, TX

104 Poth St, Yoakum, TX, 77995

Construction complete · Sep 2025Inspection Complete

New CTE & Maintenance Buildings (2) is a new construction project at 104 Poth St, Yoakum, in Dewitt County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2025). The project has an estimated value of $2.8M across about 9,988 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,988 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$280/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 17, 2024501 days across supplied datesSep 30, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    456 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About New CTE & Maintenance Buildings (2)

The new maintenance building for Yoakum High School stands at 104 Poth St in Yoakum, Texas. This new construction project covers 9,988 sq ft and is designed as a pre-engineered structure with a metal panel exterior veneer. The building passed its final TDLR accessibility inspection in September 2025, confirming that construction is complete.

Yoakum ISD serves as the owner of record for this facility. The design firm of record is Rawley McCoy & Associates, which also handled other local school projects. The estimated cost for this specific building was $2,800,000, equating to $280 per square foot. This figure is above the county median of $119 per square foot for similar new construction filings in Dewitt County.

The project was registered with TDLR in May 2024. Construction began in July 2024, with a scheduled completion date of September 2025. The filing identifies the registered accessibility specialist as Timothy D Westphal. The scope of work explicitly lists the creation of a new maintenance building to support the school’s operational needs.

Context and Comparisons

Yoakum ISD has five other TDLR-registered projects totaling $11,977,855. These include a new softball complex, a CTE building, and an administration building. Rawley McCoy & Associates has six other registered projects totaling $29,864,646, including work for Gregory-Portland ISD and Calallen ISD. The scheduled build window for this maintenance building was 456 days, which is longer than the county median of 243 days.

The site is located in a residential and commercial area of Yoakum. Nearby businesses include Sonic Drive-In, Snappy's Market #4, and Zimmerman Electric. The project involves public funds and public land. The TDLR status is marked as Inspection Complete, reflecting the successful conclusion of the construction and review process for this specific facility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77995 (Yoakum)

One email per change. Unsubscribe in one click. Privacy.

New CTE & Maintenance Buildings (2) is a New Construction project located at 104 Poth St, Yoakum, TX 77995 in Yoakum, Texas. The project has an estimated value of $2.8M covering 9,988 sq ft. Yoakum ISD is the property owner and Rawley McCoy & Associates is the design firm of record. The project was registered with TDLR on May 17, 2024.

Frequently Asked Questions

Is the Yoakum High School maintenance building finished?

Yes, the building passed its final TDLR accessibility inspection in September 2025. The TDLR status is listed as Inspection Complete, indicating that the construction phase is done.

Who designed the new maintenance building?

Rawley McCoy & Associates is the design firm of record. They are also responsible for other Yoakum ISD projects, including the new softball complex and the CTE building.

How much did the project cost?

The estimated cost was $2,800,000. This amounts to $280 per square foot, which is above the Dewitt County median of $119 per square foot for comparable new construction.

What is the size of the building?

The maintenance building is 9,988 sq ft. It is a pre-engineered structure with a metal panel exterior veneer, built to support school maintenance operations.

When did construction take place?

Construction started in July 2024 and was completed in September 2025. The project was registered with TDLR in May 2024 prior to the start of work.

What is New CTE & Maintenance Buildings (2)?

New CTE & Maintenance Buildings (2) is a new construction project at 104 Poth St in Yoakum, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New maintenance building. Pre-engineered structure with metal panel exterior veneer.

Is New CTE & Maintenance Buildings (2) open in Yoakum?

Construction on New CTE & Maintenance Buildings (2) is complete — TDLR records show the project passed its required accessibility inspection in Sep 2025. The building is finished and very likely open.

Where is New CTE & Maintenance Buildings (2) located?

New CTE & Maintenance Buildings (2) is located at 104 Poth St, Yoakum, TX, 77995, in Dewitt County.

Who is the owner or developer of New CTE & Maintenance Buildings (2)?

Yoakum ISD is the property owner/developer of record for New CTE & Maintenance Buildings (2), per its TDLR project registration.

Who is the architect or design firm for New CTE & Maintenance Buildings (2)?

Rawley McCoy & Associates is the design firm of record for New CTE & Maintenance Buildings (2), according to its TDLR filing.

How much does New CTE & Maintenance Buildings (2) cost and how big is it?

New CTE & Maintenance Buildings (2) has an estimated construction value of $2.8M and approximately 9,988 square feet (about $280/sqft), based on its TDLR filing.

Scope of Work

New maintenance building. Pre-engineered structure with metal panel exterior veneer.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

104 Poth St, Yoakum, TX, 77995

Loading location map…
29.28964, -97.15983

Watch all construction in 77995 (Yoakum)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.