Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
High School Fine Arts & Cafeteria Addition in Portland, TX
4601 Wildcat Drive, Portland, TX, 78374
High School Fine Arts & Cafeteria Addition is a renovation/alteration project at 4601 Wildcat Drive, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $19.6M across about 18,147 sq ft.
- Estimated project value
- $19.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 18,147 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.08K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
39 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
657 days after the preceding date shown.
Source: TDLR filing
View source record
📰About High School Fine Arts & Cafeteria Addition
The Gregory-Portland ISD High School Fine Arts & Cafeteria Addition is a major renovation and alteration project located at 4601 Wildcat Drive in Portland, Texas. The scope includes a new band hall, renovations to the existing fine arts area, and an expansion of the cafeteria eating space. The total estimated cost for this work is $19,600,000, covering 18,147 square feet of new and altered construction.
Gregory-Portland ISD is the owner of record for this project, which sits in San Patricio County. The design firm of record is Rawley McCoy & Associates, while Timothy D Westphal serves as the registered accessibility specialist. The project was registered with TDLR in October 2024, and plan review was completed in the same month. Construction was scheduled to begin in November 2024, with a planned completion date of September 2026.
Project Scale and Cost Context
At $19,600,000, this project is significantly larger than the median renovation or alteration filing in San Patricio County, which stands at $250,000. The estimated cost per square foot is $1,080, which is well above the county median of $70 per square foot for similar projects. The scheduled build window of 657 days is also longer than the county median of 106 days, reflecting the complexity of integrating a new band hall and cafeteria upgrades into an existing high school facility.
Gregory-Portland ISD has six other TDLR-registered projects totaling $9,250,000, including an Early Childhood Center Addition and several elementary school renovations. Rawley McCoy & Associates has also been the design firm for six other projects totaling $13,064,646, including stadium and school facilities in Yoakum and Corpus Christi. This project is one of several major developments in the area, which also includes a new construction project for Gregory-Portland High School and renovations at East Cliff Elementary.
Current Status and Record
The TDLR status for this project is Review Complete. Although the scheduled completion date of September 2026 has passed, TDLR has not yet recorded a final inspection. This means the current state of the site is not confirmed in the public record.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78374 (Portland)
One email per change. Unsubscribe in one click. Privacy.
High School Fine Arts & Cafeteria Addition is a Renovation/Alteration project located at 4601 Wildcat Drive, Portland, TX 78374 in Portland, Texas. The project has an estimated value of $19.6M covering 18,147 sq ft. Gregory-Portland ISD is the property owner and Rawley McCoy & Associates is the design firm of record. The project was registered with TDLR on October 7, 2024.
Frequently Asked Questions
What is the scope of the work at Gregory-Portland ISD High School?
The scope includes a new band hall addition, renovation of the existing fine arts area, an addition to the existing cafeteria eating space, and renovation of the existing cafeteria.
Who is the design firm for this project?
Rawley McCoy & Associates is the design firm of record for the Gregory-Portland ISD High School Fine Arts & Cafeteria Addition.
Is the project open to the public?
The TDLR record has not yet recorded a final inspection, so the current operational status of the facility is not confirmed in the public record.
What is the estimated cost per square foot?
The estimated cost per square foot for this project is $1,080, based on the total estimated cost of $19,600,000 and 18,147 square feet.
When was the project registered with TDLR?
The project was registered with TDLR in October 2024, and plan review was completed in the same month.
What is High School Fine Arts & Cafeteria Addition?
High School Fine Arts & Cafeteria Addition is a renovation/alteration project at 4601 Wildcat Drive in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New band hall addition & renovation of existing final arts area. Addition to existing cafeteria eating space & renovation of existing cafeteria.
Is High School Fine Arts & Cafeteria Addition open in Portland?
High School Fine Arts & Cafeteria Addition was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is High School Fine Arts & Cafeteria Addition located?
High School Fine Arts & Cafeteria Addition is located at 4601 Wildcat Drive, Portland, TX, 78374, in San Patricio County.
Who is the owner or developer of High School Fine Arts & Cafeteria Addition?
Gregory-Portland ISD is the property owner/developer of record for High School Fine Arts & Cafeteria Addition, per its TDLR project registration.
Who is the architect or design firm for High School Fine Arts & Cafeteria Addition?
Rawley McCoy & Associates is the design firm of record for High School Fine Arts & Cafeteria Addition, according to its TDLR filing.
How much does High School Fine Arts & Cafeteria Addition cost and how big is it?
High School Fine Arts & Cafeteria Addition has an estimated construction value of $19.6M and approximately 18,147 square feet (about $1.08K/sqft), based on its TDLR filing.
Scope of Work
New band hall addition & renovation of existing final arts area. Addition to existing cafeteria eating space & renovation of existing cafeteria.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4601 Wildcat Drive, Portland, TX, 78374
Related Projects
Same Owner
$294.5M totalNearby Projects
Within 0.6 miWatch all construction in 78374 (Portland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Portland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.