Project intelligenceTDLR TABS2025017601Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

High School Gym & Restrooms Renovations in Portland, TX

4601 Wildcat Dr, Portland, TX, 78374

Target date passed (Sep 2025)Review Complete

High School Gym & Restrooms Renovations is a renovation/alteration project at 4601 Wildcat Dr, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.6M across about 20,843 sq ft.

Estimated project value
$2.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,843 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$125/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 28, 2025140 days across supplied datesSep 15, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About High School Gym & Restrooms Renovations

The Gregory-Portland ISD High School renovation project, filed under the name High School Gym & Restrooms Renovations, targets 20,843 sq ft of interior space at 4601 Wildcat Dr in Portland. The estimated cost for this renovation and alteration work is $2,600,000, which calculates to $125 per square foot. This figure sits above the median cost per square foot for similar renovation filings in San Patricio County, which stands at $70.

The scope of work focuses on two distinct areas within the facility. Public restrooms are undergoing fixture and finish replacement. Meanwhile, the gymnasium areas are receiving new lighting, sound systems, acoustical panels, and painting. These improvements are designed to modernize the school's athletic and public facilities while maintaining functionality for students and staff.

Gregory-Portland ISD is the owner of record for this project. The design firm is Rawley McCoy & Associates, a firm that has handled several other school projects in the region, including facilities in Yoakum and Corpus Christi. Timothy D Westphal serves as the registered accessibility specialist for the filing. The project involves public funds and public land, consistent with its status as a public school district initiative.

TDLR completed the plan review in April 2025. Construction was scheduled to begin in June 2025 with a target completion date of September 2025. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project remains in the review complete status within the state's accessibility tracking system.

This renovation is part of a broader portfolio of work by Gregory-Portland ISD, which has six other TDLR-registered projects totaling $26,250,000. These include additions to the Early Childhood Center and renovations at East Cliff Elementary School. The local area includes Ray Akins Wildcat Stadium and the First United Methodist Church, placing the high school within a dense cluster of community institutions in the ZIP 78374 area.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78374 (Portland)

One email per change. Unsubscribe in one click. Privacy.

High School Gym & Restrooms Renovations is a Renovation/Alteration project located at 4601 Wildcat Dr in Portland, Texas. The project has an estimated value of $2.6M covering 20,843 sq ft. Gregory-Portland ISD is the property owner and Rawley McCoy & Associates is the design firm of record. The project was registered with TDLR on April 28, 2025.

Frequently Asked Questions

What is the estimated cost of the renovation?

The estimated cost for the High School Gym & Restrooms Renovations is $2,600,000. This amount covers the interior fixture replacement, new lighting, and acoustic upgrades across 20,843 sq ft of the facility.

Who is the design firm for this project?

Rawley McCoy & Associates is the design firm of record. They have previously worked on other school projects in the region, including facilities in Yoakum and Corpus Christi, and are responsible for the architectural planning of this renovation.

Is the project finished?

The scheduled completion date was September 2025, but TDLR has not yet recorded a final inspection. Therefore, the public record does not confirm that construction is complete or that the site is ready for use.

What specific areas are being renovated?

The work includes interior fixture and finish replacement at public restrooms. The gymnasium areas are also receiving new lighting, sound systems, acoustical panels, and painting to improve the environment for athletic activities.

Where is the project located?

The project is located at 4601 Wildcat Dr in Portland, San Patricio County. This address is the site of the Gregory-Portland ISD High School, which is undergoing the specific gym and restroom renovations described in the filing.

What is High School Gym & Restrooms Renovations?

High School Gym & Restrooms Renovations is a renovation/alteration project at 4601 Wildcat Dr in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fixture & finish replacement at public restrooms. New lighting, sound, acoustical panels, & painting at gymnasium areas.

Is High School Gym & Restrooms Renovations open in Portland?

High School Gym & Restrooms Renovations was scheduled to finish construction in Sep 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is High School Gym & Restrooms Renovations located?

High School Gym & Restrooms Renovations is located at 4601 Wildcat Dr, Portland, TX, 78374, in San Patricio County.

Who is the owner or developer of High School Gym & Restrooms Renovations?

Gregory-Portland ISD is the property owner/developer of record for High School Gym & Restrooms Renovations, per its TDLR project registration.

Who is the architect or design firm for High School Gym & Restrooms Renovations?

Rawley McCoy & Associates is the design firm of record for High School Gym & Restrooms Renovations, according to its TDLR filing.

How much does High School Gym & Restrooms Renovations cost and how big is it?

High School Gym & Restrooms Renovations has an estimated construction value of $2.6M and approximately 20,843 square feet (about $125/sqft), based on its TDLR filing.

Scope of Work

Interior fixture & finish replacement at public restrooms. New lighting, sound, acoustical panels, & painting at gymnasium areas.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4601 Wildcat Dr, Portland, TX, 78374

Loading location map…
27.89913, -97.32486

Watch all construction in 78374 (Portland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Portland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.