Project intelligenceTDLR TABS2027003633Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

G-PISD High School Renovations - Package 5 - Bldg. F & G in Portland, TX

4601 Wildcat Dr., Portland, TX, 78374

Opening ~Aug 2027Project Registered

G-PISD High School Renovations - Package 5 - Bldg. F & G is a renovation/alteration project at 4601 Wildcat Dr., Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $1.0M across about 13,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$77/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 15, 2026320 days across supplied datesAug 31, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    260 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About G-PISD High School Renovations - Package 5 - Bldg. F & G

Gregory-Portland Independent School District is renovating the main corridors of its high school in Portland, Texas. The project, filed with the Texas Department of Licensing and Regulatory Affairs (TDLR) as G-PISD High School Renovations - Package 5 - Bldg. F & G, covers 13,000 square feet of work at 4601 Wildcat Dr. The estimated cost for this renovation and alteration is $1,000,000.

The construction scope focuses specifically on the renovation of the G-PISD High School main corridors. Turner Ramirez Architects serves as the design firm of record for this project. Jose Ricardo Guerrero is the registered accessibility specialist listed in the filing. The work is classified as a renovation and alteration, utilizing public funds on public land.

Construction is scheduled to begin in December 2026. The project was registered with TDLR in October 2026, and completion is targeted for August 2027. This timeline represents a 260-day build window, which is longer than the county median of 105 days for similar renovation and alteration filings in San Patricio County.

Project Context and Cost Analysis

The estimated cost of $1,000,000 places this project in the top quarter of renovation and alteration filings in San Patricio County. The median estimated cost for this work type in the county is $250,000. The cost per square foot is $77, which is close to the county median of $70 per square foot. The project size of 13,000 square feet exceeds the county median of 5,000 square feet for comparable filings.

Gregory-Portland Independent School District has six other TDLR-registered projects totaling $14,630,464. These include renovations to Building C, the Administration Building, and East Cliff Elementary. Turner Ramirez Architects has six other registered projects totaling $75,726,088, including work on the Wallace Research Facility and the Corpus Christi Museum of Science and History.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78374 (Portland)

One email per change. Unsubscribe in one click. Privacy.

G-PISD High School Renovations - Package 5 - Bldg. F & G is a Renovation/Alteration project located at 4601 Wildcat Dr., Portland, TX 78374 in Portland, Texas. The project has an estimated value of $1.0M covering 13,000 sq ft. Gregory-Portland Independent School District is the property owner and Turner Ramirez Architects is the design firm of record. The project was registered with TDLR on October 15, 2026.

Frequently Asked Questions

What is the exact scope of work for this project?

The filing specifies the renovation of the G-PISD High School main corridors. It is classified as a renovation and alteration covering 13,000 square feet.

Who is the owner and design firm for this renovation?

The owner is Gregory-Portland Independent School District. The design firm of record is Turner Ramirez Architects.

When is the construction expected to be finished?

The project is registered with TDLR and completion is targeted for August 2027. Construction is scheduled to start in December 2026.

Is the project located in a flood zone?

It is located in flood zone X according to the FEMA National Flood Hazard Layer.

How does the cost compare to other projects in San Patricio County?

The $1,000,000 estimated cost is above the county median of $250,000 for renovation and alteration filings. It places the project in the top quarter of costs for that type.

What is G-PISD High School Renovations - Package 5 - Bldg. F & G?

G-PISD High School Renovations - Package 5 - Bldg. F & G is a renovation/alteration project at 4601 Wildcat Dr. in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of the G-PISD High School Main Corridors

Is G-PISD High School Renovations - Package 5 - Bldg. F & G open in Portland?

G-PISD High School Renovations - Package 5 - Bldg. F & G is still under construction in Portland, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is G-PISD High School Renovations - Package 5 - Bldg. F & G located?

G-PISD High School Renovations - Package 5 - Bldg. F & G is located at 4601 Wildcat Dr., Portland, TX, 78374, in San Patricio County.

Who is the owner or developer of G-PISD High School Renovations - Package 5 - Bldg. F & G?

Gregory-Portland Independent School District is the property owner/developer of record for G-PISD High School Renovations - Package 5 - Bldg. F & G, per its TDLR project registration.

Who is the architect or design firm for G-PISD High School Renovations - Package 5 - Bldg. F & G?

Turner Ramirez Architects is the design firm of record for G-PISD High School Renovations - Package 5 - Bldg. F & G, according to its TDLR filing.

How much does G-PISD High School Renovations - Package 5 - Bldg. F & G cost and how big is it?

G-PISD High School Renovations - Package 5 - Bldg. F & G has an estimated construction value of $1.0M and approximately 13,000 square feet (about $77/sqft), based on its TDLR filing.

Scope of Work

Renovation of the G-PISD High School Main Corridors

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4601 Wildcat Dr., Portland, TX, 78374

Loading location map…
27.89913, -97.32486

Watch all construction in 78374 (Portland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Portland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.