Project intelligenceTDLR TABS2024019361Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Main Street (1st Street to North County Road) in Frisco, TX

Main Street (1st Street to North County Rd)Frisco, Frisco, TX, 75034

Construction complete · Aug 2026Inspection Complete

Main Street (1st Street to North County Road) is a renovation/alteration project at Main Street (1st Street to North County Rd)Frisco, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.5M across about 80,910 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,910 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$19/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 24, 2024802 days across supplied datesAug 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    578 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    216 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75034 (Frisco)

One email per change. Unsubscribe in one click. Privacy.

Main Street (1st Street to North County Road) is a Renovation/Alteration project located at Main Street (1st Street to North County Rd)Frisco, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $1.5M covering 80,910 sq ft. City of Frisco is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on May 24, 2024.

Frequently Asked Questions

What is Main Street (1st Street to North County Road)?

Main Street (1st Street to North County Road) is a renovation/alteration project at Main Street (1st Street to North County Rd)Frisco in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes sidewalk replacement along Main Street from 1st Street to N County Road, a new traffic signal at the 4th Street intersection, and traffic signal modifications at the 5th Street and N County Road intersections (80,910…

Is Main Street (1st Street to North County Road) open in Frisco?

Construction on Main Street (1st Street to North County Road) is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Main Street (1st Street to North County Road) located?

Main Street (1st Street to North County Road) is located at Main Street (1st Street to North County Rd)Frisco, Frisco, TX, 75034, in Collin County.

Who is the owner or developer of Main Street (1st Street to North County Road)?

City of Frisco is the property owner/developer of record for Main Street (1st Street to North County Road), per its TDLR project registration.

Who is the architect or design firm for Main Street (1st Street to North County Road)?

Kimley-Horn and Associates, Inc. is the design firm of record for Main Street (1st Street to North County Road), according to its TDLR filing.

How much does Main Street (1st Street to North County Road) cost and how big is it?

Main Street (1st Street to North County Road) has an estimated construction value of $1.5M and approximately 80,910 square feet (about $19/sqft), based on its TDLR filing.

Scope of Work

The project includes sidewalk replacement along Main Street from 1st Street to N County Road, a new traffic signal at the 4th Street intersection, and traffic signal modifications at the 5th Street and N County Road intersections (80,910 sf).

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Main Street (1st Street to North County Rd)Frisco, Frisco, TX, 75034

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75034 (Frisco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.