Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Crowley High School Replacement
512 Peach St, Crowley, TX, 76036
Crowley High School Replacement is a renovation/alteration project at 512 Peach St, Crowley, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $50K across about 2,000 sq ft.
- Estimated project value
- $50K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $25/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
24 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
56 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76036 (Crowley)
One email per change. Unsubscribe in one click. Privacy.
Crowley High School Replacement is a Renovation/Alteration project located at 512 Peach St, Crowley, TX 76036 in Crowley, Texas. The project has an estimated value of $50K covering 2,000 sq ft. Crowley ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on May 24, 2024.
Frequently Asked Questions
What is Crowley High School Replacement?
Crowley High School Replacement is a renovation/alteration project at 512 Peach St in Crowley, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovate existing classroom portables, remove existing accessible ramps and construct new accessibly ramps to portables, renovate toilets for accessibility, renovate parking spaces to provide accessible parking spaces
Is Crowley High School Replacement open in Crowley?
Construction on Crowley High School Replacement is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Crowley High School Replacement located?
Crowley High School Replacement is located at 512 Peach St, Crowley, TX, 76036, in Tarrant County.
Who is the owner or developer of Crowley High School Replacement?
Crowley ISD is the property owner/developer of record for Crowley High School Replacement, per its TDLR project registration.
Who is the architect or design firm for Crowley High School Replacement?
VLK Architects Inc is the design firm of record for Crowley High School Replacement, according to its TDLR filing.
How much does Crowley High School Replacement cost and how big is it?
Crowley High School Replacement has an estimated construction value of $50K and approximately 2,000 square feet (about $25/sqft), based on its TDLR filing.
Scope of Work
renovate existing classroom portables, remove existing accessible ramps and construct new accessibly ramps to portables, renovate toilets for accessibility, renovate parking spaces to provide accessible parking spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
512 Peach St, Crowley, TX, 76036
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.09B totalSame Design Firm
$16.17B totalWatch all construction in 76036 (Crowley)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Crowley?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.