Project intelligenceTDLR TABS2024019964Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

BP PULSE EV CHARGING STATIONS in Baytown, TX

6800 THOMPSON RD., Baytown, TX, 77705

Target date passed (Jan 2026)Review Complete

BP PULSE EV CHARGING STATIONS is a renovation/alteration project at 6800 THOMPSON RD., Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $175K across about 1,000 sq ft.

Estimated project value
$175K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$175/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 3, 2024589 days across supplied datesJan 13, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    393 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    196 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77705 (Baytown)

One email per change. Unsubscribe in one click. Privacy.

BP PULSE EV CHARGING STATIONS is a Renovation/Alteration project located at 6800 THOMPSON RD., Baytown, TX 77705 in Baytown, Texas. The project has an estimated value of $175K covering 1,000 sq ft. HPT TA PROPERTIES TRUST is the property owner and LDC CORP is the design firm of record. The project was registered with TDLR on June 3, 2024.

Frequently Asked Questions

What is BP PULSE EV CHARGING STATIONS?

BP PULSE EV CHARGING STATIONS is a renovation/alteration project at 6800 THOMPSON RD. in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INSTALL 10 LEVEL 3 EV CHARGING STATIONS IN EXISTING PARKING LOT

Is BP PULSE EV CHARGING STATIONS open in Baytown?

BP PULSE EV CHARGING STATIONS was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is BP PULSE EV CHARGING STATIONS located?

BP PULSE EV CHARGING STATIONS is located at 6800 THOMPSON RD., Baytown, TX, 77705, in Harris County.

Who is the owner or developer of BP PULSE EV CHARGING STATIONS?

HPT TA PROPERTIES TRUST is the property owner/developer of record for BP PULSE EV CHARGING STATIONS, per its TDLR project registration.

Who is the architect or design firm for BP PULSE EV CHARGING STATIONS?

LDC CORP is the design firm of record for BP PULSE EV CHARGING STATIONS, according to its TDLR filing.

How much does BP PULSE EV CHARGING STATIONS cost and how big is it?

BP PULSE EV CHARGING STATIONS has an estimated construction value of $175K and approximately 1,000 square feet (about $175/sqft), based on its TDLR filing.

Scope of Work

INSTALL 10 LEVEL 3 EV CHARGING STATIONS IN EXISTING PARKING LOT

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6800 THOMPSON RD., Baytown, TX, 77705

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77705 (Baytown)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.