Funding type
This project is privately funded, on private land for private use.
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147
6170 IH 10, San Antonio, TX, 78219
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 is a renovation/alteration project at 6170 IH 10, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $17.5M across about 1,000 sq ft.
- Estimated project value
- $17.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $17.50K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
101 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
36 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78219 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 is a Renovation/Alteration project located at 6170 IH 10, San Antonio, TX 78219 in San Antonio, Texas. The project has an estimated value of $17.5M covering 1,000 sq ft. TA OPERATING LLC is the property owner and LDC CORP is the design firm of record. The project was registered with TDLR on April 24, 2024.
Frequently Asked Questions
What is BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147?
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 is a renovation/alteration project at 6170 IH 10 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INSTALL 6 DCFC ELECTRIC VEHICLE CHARGING STATIONS IN EXISTING PARKING LOT
Is BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 open in San Antonio?
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 was scheduled to finish construction in Sep 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 located?
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 is located at 6170 IH 10, San Antonio, TX, 78219, in Bexar County.
Who is the owner or developer of BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147?
TA OPERATING LLC is the property owner/developer of record for BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147, per its TDLR project registration.
Who is the architect or design firm for BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147?
LDC CORP is the design firm of record for BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147, according to its TDLR filing.
How much does BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 cost and how big is it?
BP PULSE ELECTRIC VEHICLE CHARGING STATIONS 147 has an estimated construction value of $17.5M and approximately 1,000 square feet (about $17.50K/sqft), based on its TDLR filing.
Scope of Work
INSTALL 6 DCFC ELECTRIC VEHICLE CHARGING STATIONS IN EXISTING PARKING LOT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6170 IH 10, San Antonio, TX, 78219
Related Projects
Same Owner
$28.5M totalRelated City Permits
Building permits found at or near this location
6170 IH 10
6170 IH 10
Site Work - BP Pulse EV Charging Stations
6170 IH 10
John Howard
Watch all construction in 78219 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.