PS3B OCS-M
PS3B OCS-M is a renovation/alteration project at 301 E Parmer Ln, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $470K across about 1,000 sq ft.
๐Project Metrics
TDLR #TABS2024019975Project Closed
Project has been completed and closed
PS3B OCS-M is a Renovation/Alteration project located at 301 E Parmer Ln, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $470K covering 1,000 sq ft. Dell Technologies is the property owner and Cushing Terrell is the design firm of record. The project was registered with TDLR on June 4, 2024.
โFrequently Asked Questions
What is PS3B OCS-M?
PS3B OCS-M is a renovation/alteration project at 301 E Parmer Ln in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INSTALLATION OF NEW SERVER RACKS, COLD AISLE CONTAINM ENT, AND ASSOCIATED ELECTRICAL AND MECHANICAL UPGRADES W ITHIN AN EXISTING BUILDING.
Is PS3B OCS-M open in Austin?
Construction on PS3B OCS-M is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is PS3B OCS-M located?
PS3B OCS-M is located at 301 E Parmer Ln, Austin, TX, 78753, in Travis County.
Who is the owner or developer of PS3B OCS-M?
Dell Technologies is the property owner/developer of record for PS3B OCS-M, per its TDLR project registration.
Who is the architect or design firm for PS3B OCS-M?
Cushing Terrell is the design firm of record for PS3B OCS-M, according to its TDLR filing.
How much does PS3B OCS-M cost and how big is it?
PS3B OCS-M has an estimated construction value of $470K and approximately 1,000 square feet (about $470/sqft), based on its TDLR filing.
๐Scope of Work
INSTALLATION OF NEW SERVER RACKS, COLD AISLE CONTAINM ENT, AND ASSOCIATED ELECTRICAL AND MECHANICAL UPGRADES W ITHIN AN EXISTING BUILDING.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 4, 2024
Review Complete
Jun 4, 2024
Inspection Complete
Jan 17, 2026
Closed
Apr 8, 2026
592d
Construction phase
๐Related Projects
๐คSame Owner
$16.3M total๐๏ธSame Design Firm
$1.1M total๐Related City Permits
Building permits found at or near this location
Replace kitchen outlets with GFCI bring garbage disposal hook up to code Install CIP concrete ramp and landing at front door to driveway.
Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. No structural or exterior work is proposed- Suite 5402
TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work