Project intelligenceTDLR TABS2024020302Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 105 (CSJ: 0451-04-025, etc.)

From: S Goliad St To: Collin County Line, Rockwall, TX, 75032

Opening ~Jul 2028Review Complete

SH 105 (CSJ: 0451-04-025, etc.) is a renovation/alteration project at From: S Goliad St To: Collin County Line, Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2028. The project has an estimated value of $66.1M across about 401,433 sq ft.

Estimated project value
$66.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
401,433 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$165/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 6, 20241,486 days across supplied datesJul 1, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    755 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    731 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75032 (Rockwall)

One email per change. Unsubscribe in one click. Privacy.

SH 105 (CSJ: 0451-04-025, etc.) is a Renovation/Alteration project located at From: S Goliad St To: Collin County Line, Rockwall, TX 75032 in Rockwall, Texas. The project has an estimated value of $66.1M covering 401,433 sq ft. TxDOT District: Dallas is the property owner. The project was registered with TDLR on June 6, 2024.

Frequently Asked Questions

What is SH 105 (CSJ: 0451-04-025, etc.)?

SH 105 (CSJ: 0451-04-025, etc.) is a renovation/alteration project at From: S Goliad St To: Collin County Line in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen 2 lane to 4 lane roadway (6 lane ultimate).

Is SH 105 (CSJ: 0451-04-025, etc.) open in Rockwall?

SH 105 (CSJ: 0451-04-025, etc.) is still under construction in Rockwall, TX, with an estimated completion of Jul 2028 according to its TDLR registration.

Where is SH 105 (CSJ: 0451-04-025, etc.) located?

SH 105 (CSJ: 0451-04-025, etc.) is located at From: S Goliad St To: Collin County Line, Rockwall, TX, 75032, in Rockwall County.

Who is the owner or developer of SH 105 (CSJ: 0451-04-025, etc.)?

TxDOT District: Dallas is the property owner/developer of record for SH 105 (CSJ: 0451-04-025, etc.), per its TDLR project registration.

How much does SH 105 (CSJ: 0451-04-025, etc.) cost and how big is it?

SH 105 (CSJ: 0451-04-025, etc.) has an estimated construction value of $66.1M and approximately 401,433 square feet (about $165/sqft), based on its TDLR filing.

Scope of Work

Reconstruct and widen 2 lane to 4 lane roadway (6 lane ultimate).

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: S Goliad St To: Collin County Line, Rockwall, TX 75032

32.88027, -96.45085

Watch all construction in 75032 (Rockwall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Rockwall

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists