Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Judson Independent School District Gymnasium HVAC Upgrades Phase 1
8439 Athenian, Universal City, TX, 78148
Judson Independent School District Gymnasium HVAC Upgrades Phase 1 is a renovation/alteration project at 8439 Athenian, Universal City, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $308K across about 5,000 sq ft.
- Estimated project value
- $308K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $62/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
44 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
468 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
313 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Judson Independent School District Gymnasium HVAC Upgrades Phase 1
Judson Independent School District completed a $308,176 renovation at Olympia Elementary School in Universal City to upgrade the gymnasium HVAC system. The project, filed under the name Judson Independent School District Gymnasium HVAC Upgrades Phase 1, involved the demolition of existing unit heaters and ventilation fans. The scope included installing a ground-mounted rooftop unit outside the gym and routing new ductwork inside to provide cooling. A concrete slab and fencing were also constructed around the new equipment.
The work covered 5,000 square feet of space within the school facility located at 8439 Athenian. This renovation was classified as a Renovation/Alteration project. The estimated cost of $308,176 works out to $62 per square foot. This figure is below the county median of $85 per square foot for similar renovation and alteration filings in Bexar County. However, the total cost is above the county median of $250,000 for this project type.
Cleary Zimmermann Engineers served as the design firm of record for the project. The construction timeline began in July 2024. The scheduled build window lasted 468 days, which is longer than the county median of 103 days for comparable projects. The final inspection was passed in November 2025, marking the completion of the physical work and the verification of the new cooling infrastructure.
Project Status and Record
The project was registered with the Texas Department of Licensing and Regulation in June 2024. TDLR closed the project file in September 2026, which marks the end of the accessibility review process for this construction. This status confirms that all required reviews and inspections were finalized. The record indicates the project is fully closed and no longer active in the state’s accessibility review system.
Judson ISD has registered six other projects with TDLR, totaling $38,930,966. These include facilities in San Antonio and Universal City, such as Wagner High School and the Academic/Athletic Building. Cleary Zimmermann Engineers has also been involved in other projects, including Hobby Middle School and the International Advanced Technology Center Building 12. The local area, ZIP code 78148, has a population of about 22,630 and a median household income of $75,395 according to U.S. Census estimates.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78148 (Universal City)
One email per change. Unsubscribe in one click. Privacy.
Judson Independent School District Gymnasium HVAC Upgrades Phase 1 is a Renovation/Alteration project located at 8439 Athenian, Universal City, TX 78148 in Universal City, Texas. The project has an estimated value of $308K covering 5,000 sq ft. JUDSON ISD is the property owner and Cleary Zimmermann Engineers is the design firm of record. The project was registered with TDLR on June 7, 2024.
Frequently Asked Questions
Is the Olympia Elementary School gym HVAC project finished?
Yes, the final inspection was passed in November 2025. TDLR closed the project file in September 2026, indicating the accessibility review process is complete and the construction record is finalized.
Who designed the gymnasium HVAC upgrades?
Cleary Zimmermann Engineers is listed as the design firm of record for the Judson Independent School District Gymnasium HVAC Upgrades Phase 1 project.
What was the estimated cost of the renovation?
The estimated cost was $308,176. This amounts to $62 per square foot for the 5,000 square feet of work involved in the gymnasium upgrades.
When did construction start and end?
Construction started in July 2024. The final inspection was passed in November 2025, and TDLR closed the project file in September 2026.
Where is the Olympia Elementary School project located?
The project is located at 8439 Athenian in Universal City, Texas, within Bexar County.
What is Judson Independent School District Gymnasium HVAC Upgrades Phase 1?
Judson Independent School District Gymnasium HVAC Upgrades Phase 1 is a renovation/alteration project at 8439 Athenian in Universal City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolish existing unit heaters and ventilation fans in gym. Install ground mounted RTU outside gym and route ductwork inside gym to provide cooling. Provide concrete slab and fencing around RTU. 5000 sqft.
Is Judson Independent School District Gymnasium HVAC Upgrades Phase 1 open in Universal City?
Construction on Judson Independent School District Gymnasium HVAC Upgrades Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is Judson Independent School District Gymnasium HVAC Upgrades Phase 1 located?
Judson Independent School District Gymnasium HVAC Upgrades Phase 1 is located at 8439 Athenian, Universal City, TX, 78148, in Bexar County.
Who is the owner or developer of Judson Independent School District Gymnasium HVAC Upgrades Phase 1?
JUDSON ISD is the property owner/developer of record for Judson Independent School District Gymnasium HVAC Upgrades Phase 1, per its TDLR project registration.
Who is the architect or design firm for Judson Independent School District Gymnasium HVAC Upgrades Phase 1?
Cleary Zimmermann Engineers is the design firm of record for Judson Independent School District Gymnasium HVAC Upgrades Phase 1, according to its TDLR filing.
How much does Judson Independent School District Gymnasium HVAC Upgrades Phase 1 cost and how big is it?
Judson Independent School District Gymnasium HVAC Upgrades Phase 1 has an estimated construction value of $308K and approximately 5,000 square feet (about $62/sqft), based on its TDLR filing.
Scope of Work
Demolish existing unit heaters and ventilation fans in gym. Install ground mounted RTU outside gym and route ductwork inside gym to provide cooling. Provide concrete slab and fencing around RTU. 5000 sqft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8439 Athenian, Universal City, TX, 78148
Related Projects
Same Owner
$401.4M totalWatch all construction in 78148 (Universal City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Universal City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.