Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
SH 105 (CSJ: 0338-07-019, etc.)
From: San Jacinto County Line To: BUS 105, Cleveland, TX, 77328
SH 105 (CSJ: 0338-07-019, etc.) is a new construction project at From: San Jacinto County Line To: BUS 105, Cleveland, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $74.4M across about 261,828 sq ft.
- Estimated project value
- $74.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 261,828 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $284/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
173 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,101 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77328 (Cleveland)
One email per change. Unsubscribe in one click. Privacy.
SH 105 (CSJ: 0338-07-019, etc.) is a New Construction project located at From: San Jacinto County Line To: BUS 105, Cleveland, TX 77328 in Cleveland, Texas. The project has an estimated value of $74.4M covering 261,828 sq ft. TxDOT District: Houston is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on June 13, 2024.
Frequently Asked Questions
What is SH 105 (CSJ: 0338-07-019, etc.)?
SH 105 (CSJ: 0338-07-019, etc.) is a new construction project at From: San Jacinto County Line To: BUS 105 in Cleveland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct 5.202 miles of SH 105 to a 4-lane facility with a continuous two-way turn lane.
Is SH 105 (CSJ: 0338-07-019, etc.) open in Cleveland?
SH 105 (CSJ: 0338-07-019, etc.) is still under construction in Cleveland, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is SH 105 (CSJ: 0338-07-019, etc.) located?
SH 105 (CSJ: 0338-07-019, etc.) is located at From: San Jacinto County Line To: BUS 105, Cleveland, TX, 77328, in Montgomery County.
Who is the owner or developer of SH 105 (CSJ: 0338-07-019, etc.)?
TxDOT District: Houston is the property owner/developer of record for SH 105 (CSJ: 0338-07-019, etc.), per its TDLR project registration.
Who is the architect or design firm for SH 105 (CSJ: 0338-07-019, etc.)?
BGE, Inc. is the design firm of record for SH 105 (CSJ: 0338-07-019, etc.), according to its TDLR filing.
How much does SH 105 (CSJ: 0338-07-019, etc.) cost and how big is it?
SH 105 (CSJ: 0338-07-019, etc.) has an estimated construction value of $74.4M and approximately 261,828 square feet (about $284/sqft), based on its TDLR filing.
Scope of Work
Reconstruct 5.202 miles of SH 105 to a 4-lane facility with a continuous two-way turn lane.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: San Jacinto County Line To: BUS 105, Cleveland, TX, 77328
Related Projects
Same Owner
$37.03B totalNearby Projects
Within 1 kmWatch all construction in 77328 (Cleveland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cleveland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.