Project intelligenceTDLR TABS2024022304New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Spur 399 at SH 5

Spur 399 at SH 5, Mckinney, TX, 75069

Opening ~Jun 2027Review Complete

Spur 399 at SH 5 is a new construction project at Spur 399 at SH 5, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $1.9M across about 172,261 sq ft.

Estimated project value
$1.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
172,261 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$11/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 3, 20241,063 days across supplied datesJun 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    912 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Spur 399 at SH 5

TxDOT District: Dallas is reconstructing the Spur 399 interchange and widening State Highway 5 in McKinney, Texas. This new construction project, filed under CSJ: 0047-05-057, is scheduled to finish in June 2027, with construction work starting in December 2024. The project is located at Spur 399 at SH 5 in Collin County, covering an area of 172,261 sq ft.

The estimated cost for this roadway improvement is $1,885,290. This figure places the project's cost above the median estimated cost for new construction filings in Collin County, which stands at $800,000. However, the calculated cost per square foot is $11, which is below the county median of $120 per sq ft. The scheduled build window for this project is 912 days, a duration longer than the county median of 212 days for similar projects.

Project Oversight and Design

HDR serves as the design firm of record for this initiative. Frank Fonseca is the registered accessibility specialist associated with the filing. The project involves public funds, public land, or is a Federally funded roadway project, ensuring it meets specific regulatory standards. TDLR completed the plan review in July 2024, clearing the path for the construction phase to begin as planned.

TxDOT District: Dallas has six other TDLR-registered projects totaling $60,982,724 in the region, including works in Addison, Dallas, and Grand Prairie. HDR, the design firm, has been involved in six other projects totaling $313,981,500, ranging from medical centers in Abilene and Fort Worth to infrastructure in Austin. This demonstrates the extensive portfolio of both the owner and the design team in Texas construction.

Local context for McKinney (ZIP 75069) indicates a population of about 39,332 and a median household income of $82,804, according to U.S. Census ACS 2023 five-year estimates. The area features 16,958 housing units with a median owner-occupied home value of $413,700. A post by the City of McKinney described TxDOT's design for SH 5 roadway improvements from Spur 399 to McMakin Street as underway, referencing this specific CSJ number. The NCTCOG 10-Year Plan also lists this project as a priority section for Collin County and the City of McKinney.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Spur 399 at SH 5 is a New Construction project located at Spur 399 at SH 5, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $1.9M covering 172,261 sq ft. TxDOT District: Dallas is the property owner and HDR is the design firm of record. The project was registered with TDLR on July 3, 2024.

Frequently Asked Questions

When is the Spur 399 at SH 5 project scheduled to finish?

The project is scheduled to finish in June 2027. Construction work is set to start in December 2024, following the completion of plan review in July 2024.

Who is the owner of this construction project?

The owner of record is TxDOT District: Dallas. The design firm of record is HDR, and Frank Fonseca is the registered accessibility specialist.

What is the estimated cost of the project?

The estimated cost is $1,885,290. This is above the median estimated cost for new construction in Collin County, but the cost per square foot is below the county median.

Is the project currently open to the public?

This is a construction project for roadway improvements. The TDLR record indicates construction status, not business operations. The project is scheduled to finish in June 2027.

Where exactly is the work being done?

The work is located at Spur 399 at SH 5 in McKinney, TX 75069. It involves reconstructing the interchange and widening State Highway 5.

What is Spur 399 at SH 5?

Spur 399 at SH 5 is a new construction project at Spur 399 at SH 5 in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct Spur 399 Interchange and Widen SH 5

Is Spur 399 at SH 5 open in Mckinney?

Spur 399 at SH 5 is still under construction in Mckinney, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is Spur 399 at SH 5 located?

Spur 399 at SH 5 is located at Spur 399 at SH 5, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of Spur 399 at SH 5?

TxDOT District: Dallas is the property owner/developer of record for Spur 399 at SH 5, per its TDLR project registration.

Who is the architect or design firm for Spur 399 at SH 5?

HDR is the design firm of record for Spur 399 at SH 5, according to its TDLR filing.

How much does Spur 399 at SH 5 cost and how big is it?

Spur 399 at SH 5 has an estimated construction value of $1.9M and approximately 172,261 square feet (about $11/sqft), based on its TDLR filing.

Scope of Work

Reconstruct Spur 399 Interchange and Widen SH 5

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Spur 399 at SH 5, Mckinney, TX, 75069

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.