Lake Travis High School 2024 Phase 1 Improvements
Lake Travis High School 2024 Phase 1 Improvements is a new construction project at 3324 Ranch Road 620 South, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2026). The project has an estimated value of $5.8M across about 465,656 sq ft.
๐Project Metrics
TDLR #TABS2024022508Project Closed
Project has been completed and closed
Lake Travis High School 2024 Phase 1 Improvements is a New Construction project located at 3324 Ranch Road 620 South, Austin, TX 78738 in Austin, Texas. The project has an estimated value of $5.8M covering 465,656 sq ft. LAKE TRAVIS ISD is the property owner and Malone Wheeler, Inc is the design firm of record. The project was registered with TDLR on July 8, 2024.
โFrequently Asked Questions
What is Lake Travis High School 2024 Phase 1 Improvements?
Lake Travis High School 2024 Phase 1 Improvements is a new construction project at 3324 Ranch Road 620 South in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New parking lot, modifications to existing parking lot, modified drive aisles, pond modifications (Limits of construction is 465,656sf)
Is Lake Travis High School 2024 Phase 1 Improvements open in Austin?
Construction on Lake Travis High School 2024 Phase 1 Improvements is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2026. The building is finished and very likely open.
Where is Lake Travis High School 2024 Phase 1 Improvements located?
Lake Travis High School 2024 Phase 1 Improvements is located at 3324 Ranch Road 620 South, Austin, TX, 78738, in Travis County.
Who is the owner or developer of Lake Travis High School 2024 Phase 1 Improvements?
LAKE TRAVIS ISD is the property owner/developer of record for Lake Travis High School 2024 Phase 1 Improvements, per its TDLR project registration.
Who is the architect or design firm for Lake Travis High School 2024 Phase 1 Improvements?
Malone Wheeler, Inc is the design firm of record for Lake Travis High School 2024 Phase 1 Improvements, according to its TDLR filing.
How much does Lake Travis High School 2024 Phase 1 Improvements cost and how big is it?
Lake Travis High School 2024 Phase 1 Improvements has an estimated construction value of $5.8M and approximately 465,656 square feet (about $12/sqft), based on its TDLR filing.
๐Scope of Work
New parking lot, modifications to existing parking lot, modified drive aisles, pond modifications (Limits of construction is 465,656sf)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 8, 2024
Review Complete
Jul 8, 2024
Inspection Complete
Jan 4, 2026
Closed
Jul 1, 2026
545d
Construction phase
๐Related Projects
๐คSame Owner
$622.1M total๐Related City Permits
Building permits found at or near this location
Permanent Service Meter for Whole Stadium Renovation in the ETJ
temp power for jobsite trailer for the duration of construction Permit and ESPA will need a unique address. 3324 1/2 s fm 620 is already being used by meter 6127109.
Interior remodel to an existing convenience store
Replacement of complete existing central heat and air system with or without duct work
Need to disconnect meter and relevel/concrete service.
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis