Project intelligenceTDLR TABS2024024578Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lantern Lane Elementary School Interior Renovation in Missouri City, TX

3323 Mission Valley Dr, Missouri City, TX, 77459

Construction complete · Sep 2026Project Closed

Lantern Lane Elementary School Interior Renovation is a renovation/alteration project at 3323 Mission Valley Dr, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $5.2M across about 50,830 sq ft.

Estimated project value
$5.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
50,830 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$102/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 2, 2024788 days across supplied datesSep 29, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    421 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    147 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lantern Lane Elementary School Interior Renovation

Lantern Lane Elementary School in Missouri City completed a major interior renovation project valued at $5,205,990. The work, filed as Lantern Lane Elementary School Interior Renovation, covered 50,830 sq ft of the facility located at 3323 Mission Valley Dr. Fort Bend ISD served as the owner of record for this significant update to the school's physical infrastructure.

The scope of work focused on modernizing 20 classrooms across Area B and Area C. Contractors removed and replaced walls, ceilings, lighting, flooring, interior doors, and door hardware. The renovation also included updating the administration suite, painting all previously painted surfaces, and replacing existing stage steps and flooring. This comprehensive approach aimed to refresh the learning environment for students and staff.

Project Scale and Cost Context

With an estimated cost of $102 per square foot, this project exceeded the Fort Bend County median of $80 for similar renovation and alteration filings. The total budget placed the project in the top quarter of county-level costs for this type of work, which typically average $239,750. The scheduled build window of 421 days was also longer than the county median of 92 days, reflecting the complexity of the interior updates across multiple building areas.

PBK Architects served as the design firm of record, bringing experience from other large-scale projects in the region. William T Winning was the registered accessibility specialist for the filing. The project involved public funds and public land, adhering to Texas Department of Licensing and Regulation standards for accessibility. Registration with TDLR occurred in August 2024, with plan review completed the same month.

Construction began in December 2024, following the initial registration and review. The filing indicated a completion date of January 2026, although the final inspection was passed in May 2026. TDLR closed the project file in September 2026, which marks the end of the accessibility review process for this construction. This closure confirms that the regulatory requirements for the renovation were met and the file is now archived.

The project stands as one of several recent renovations by Fort Bend ISD, which has six other TDLR-registered projects totaling $2,482,065 in the area. These include updates to Walker Station, Brazos Bend, and Colony Meadow Elementary Schools. The completion of Lantern Lane Elementary School represents a significant investment in educational facilities within the Missouri City community.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Lantern Lane Elementary School Interior Renovation is a Renovation/Alteration project located at 3323 Mission Valley Dr, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $5.2M covering 50,830 sq ft. Fort Bend ISD is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on August 2, 2024.

Frequently Asked Questions

When was the Lantern Lane Elementary School renovation completed?

The final inspection was passed in May 2026. TDLR closed the project file in September 2026, marking the end of the accessibility review process for this construction.

Who was the design firm for the project?

PBK Architects served as the design firm of record for the Lantern Lane Elementary School Interior Renovation project in Missouri City.

What was the scope of the interior renovation?

The work included renovating 20 classrooms, the administration suite, and stage areas. It involved replacing walls, ceilings, lighting, flooring, doors, and hardware, as well as painting surfaces.

How did the project cost compare to county averages?

The $102 per square foot cost was above the Fort Bend County median of $80. The total budget placed it in the top quarter of similar renovation filings in the county.

Is the school open for business?

The TDLR record indicates the construction project is closed and the accessibility review is complete. The record does not provide information regarding the school's operational status or opening hours.

What is Lantern Lane Elementary School Interior Renovation?

Lantern Lane Elementary School Interior Renovation is a renovation/alteration project at 3323 Mission Valley Dr in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate 20 classrooms throughout area b and area c. remove and replace wall, ceiling/lighting and flooring, interior doors and door hardware. renovate administration suite. paint all previously painted surfaces. replace existing stage s…

Is Lantern Lane Elementary School Interior Renovation open in Missouri City?

Construction on Lantern Lane Elementary School Interior Renovation is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Lantern Lane Elementary School Interior Renovation located?

Lantern Lane Elementary School Interior Renovation is located at 3323 Mission Valley Dr, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Lantern Lane Elementary School Interior Renovation?

Fort Bend ISD is the property owner/developer of record for Lantern Lane Elementary School Interior Renovation, per its TDLR project registration.

Who is the architect or design firm for Lantern Lane Elementary School Interior Renovation?

PBK Architects is the design firm of record for Lantern Lane Elementary School Interior Renovation, according to its TDLR filing.

How much does Lantern Lane Elementary School Interior Renovation cost and how big is it?

Lantern Lane Elementary School Interior Renovation has an estimated construction value of $5.2M and approximately 50,830 square feet (about $102/sqft), based on its TDLR filing.

Scope of Work

Renovate 20 classrooms throughout area b and area c. remove and replace wall, ceiling/lighting and flooring, interior doors and door hardware. renovate administration suite. paint all previously painted surfaces. replace existing stage steps and floo

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3323 Mission Valley Dr, Missouri City, TX, 77459

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.