Project intelligenceTDLR TABS2024024584Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Walker Station Elementary School Interior Renovation in Sugar Land, TX

6200 Homeward Way, Sugar Land, TX, 77479

Construction complete · Sep 2026Project Closed

Walker Station Elementary School Interior Renovation is a renovation/alteration project at 6200 Homeward Way, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $998K across about 50,956 sq ft.

Estimated project value
$998K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
50,956 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$20/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 2, 2024788 days across supplied datesSep 29, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    421 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    147 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Walker Station Elementary School Interior Renovation

Walker Station Elementary School Interior Renovation is a completed construction project at 6200 Homeward Way in Sugar Land. The work involved a $998,119 renovation of the 50,956 sq ft facility in Fort Bend County. TDLR closed the project file in September 2026, marking the end of the accessibility review process for this construction.

The scope of work focused on updating daily student and staff environments. Contractors removed and replaced flooring and base throughout classrooms and corridors. The administration suite received significant attention, with renovations to the clinic, reception, and attendance office. Accessibility improvements included installing a wheelchair lift along the northern stage stairs. Furniture was also relocated within the campus to support the new layout.

Fort Bend ISD served as the owner of record for this public funding project. PBK Architects was the design firm of record, overseeing the alteration plans. William T Winning was the registered accessibility specialist on the filing. The project was registered with TDLR in August 2024, with plan review completed in the same month. Construction began in December 2024.

Project Scale and Cost Context

The estimated cost of $998,119 places this project above the county median for renovation and alteration filings in Fort Bend County. The median estimated cost for similar filings in the county is $239,750. While the total cost is higher, the cost per square foot was $20. This figure is below the county median of $80 per square foot for comparable renovation projects.

The scheduled build window for this project was 421 days. This duration is longer than the county median of 92 days for similar renovation and alteration filings. The project timeline extended from the December 2024 start through a January 2026 completion date listed on the filing. Final inspection passed in May 2026, confirming the physical work was finished before the administrative closure in September 2026.

Fort Bend ISD has registered six other projects with TDLR in the area. These include renovations at Brazos Bend, Colony Meadow, Oyster Creek, and Colony Bend elementary schools, as well as another Walker Station Elementary School project. PBK Architects has designed numerous other large-scale projects in the region, including facilities in Brookshire, Richmond, and Katy. The Walker Station Elementary School renovation fits within a broader pattern of infrastructure updates across the district’s sugar land campuses.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77479 (Sugar Land)

One email per change. Unsubscribe in one click. Privacy.

Walker Station Elementary School Interior Renovation is a Renovation/Alteration project located at 6200 Homeward Way, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $998K covering 50,956 sq ft. Fort Bend ISD is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on August 2, 2024.

Frequently Asked Questions

Is Walker Station Elementary School open?

The TDLR record indicates the construction project is closed and the final inspection passed in May 2026. This confirms the renovation work is finished, but the record does not specify the school's operational status or reopening date.

Who owned the Walker Station Elementary School renovation project?

Fort Bend ISD was the owner of record for this project. PBK Architects served as the design firm, and William T Winning was the registered accessibility specialist listed on the filing.

What was the cost of the Walker Station Elementary School renovation?

The estimated cost for the Walker Station Elementary School Interior Renovation was $998,119. This amount is above the median cost for similar renovation filings in Fort Bend County, though the cost per square foot was below the county median.

When did construction start and finish at Walker Station Elementary School?

Construction started in December 2024. The filing listed a completion date of January 2026. The final inspection passed in May 2026, and TDLR closed the project file in September 2026.

What accessibility features were added to Walker Station Elementary School?

The renovation included the installation of a wheelchair lift along the northern stage stairs. The project also involved removing and replacing flooring and base throughout classrooms and corridors to meet accessibility standards.

What is Walker Station Elementary School Interior Renovation?

Walker Station Elementary School Interior Renovation is a renovation/alteration project at 6200 Homeward Way in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace flooring and base throughout classrooms and corridors. renovate the clinic, reception, and attendance office in the administration suite. install a wheelchair lift along the northern stage stairs. relocate furniture wi…

Is Walker Station Elementary School Interior Renovation open in Sugar Land?

Construction on Walker Station Elementary School Interior Renovation is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Walker Station Elementary School Interior Renovation located?

Walker Station Elementary School Interior Renovation is located at 6200 Homeward Way, Sugar Land, TX, 77479, in Fort Bend County.

Who is the owner or developer of Walker Station Elementary School Interior Renovation?

Fort Bend ISD is the property owner/developer of record for Walker Station Elementary School Interior Renovation, per its TDLR project registration.

Who is the architect or design firm for Walker Station Elementary School Interior Renovation?

PBK Architects is the design firm of record for Walker Station Elementary School Interior Renovation, according to its TDLR filing.

How much does Walker Station Elementary School Interior Renovation cost and how big is it?

Walker Station Elementary School Interior Renovation has an estimated construction value of $998K and approximately 50,956 square feet (about $20/sqft), based on its TDLR filing.

Scope of Work

Remove and replace flooring and base throughout classrooms and corridors. renovate the clinic, reception, and attendance office in the administration suite. install a wheelchair lift along the northern stage stairs. relocate furniture within campus.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6200 Homeward Way, Sugar Land, TX, 77479

Location by street address

Watch all construction in 77479 (Sugar Land)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sugar Land?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.