Project intelligenceTDLR TABS2024025519Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Spence Middle School Renovation

4001 Capital Ave Dallas, Texas, Dallas, TX, 75204

Target date passed (Jul 2026)Project Registered

Spence Middle School Renovation is a renovation/alteration project at 4001 Capital Ave Dallas, Texas, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.3M across about 1,500 sq ft.

Estimated project value
$4.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.84K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 15, 2024715 days across supplied datesJul 31, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    170 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    545 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75204 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Spence Middle School Renovation is a Renovation/Alteration project located at 4001 Capital Ave Dallas, Texas, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $4.3M covering 1,500 sq ft. Dallas ISD is the property owner and DLR Group is the design firm of record. The project was registered with TDLR on August 15, 2024.

Frequently Asked Questions

What is Spence Middle School Renovation?

Spence Middle School Renovation is a renovation/alteration project at 4001 Capital Ave Dallas, Texas in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additional maintenance scope - replacement of HVAC units, replacement of exterior lights, replacement of fire alarm. Replacement of exterior sign. Replacement of windows / glazing

Is Spence Middle School Renovation open in Dallas?

Spence Middle School Renovation was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Spence Middle School Renovation located?

Spence Middle School Renovation is located at 4001 Capital Ave Dallas, Texas, Dallas, TX, 75204, in Dallas County.

Who is the owner or developer of Spence Middle School Renovation?

Dallas ISD is the property owner/developer of record for Spence Middle School Renovation, per its TDLR project registration.

Who is the architect or design firm for Spence Middle School Renovation?

DLR Group is the design firm of record for Spence Middle School Renovation, according to its TDLR filing.

How much does Spence Middle School Renovation cost and how big is it?

Spence Middle School Renovation has an estimated construction value of $4.3M and approximately 1,500 square feet (about $2.84K/sqft), based on its TDLR filing.

Scope of Work

Additional maintenance scope - replacement of HVAC units, replacement of exterior lights, replacement of fire alarm. Replacement of exterior sign. Replacement of windows / glazing

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4001 Capital Ave Dallas, Texas, Dallas, TX, 75204

Location by street address

Watch all construction in 75204 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.