Project intelligenceTDLR TABS2024025905Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Judson Independent School District Gymnasium HVAC Upgrades Phase 2

7027 Misty Ridge Dr, Converse, TX, 78109

Construction complete · Dec 2025Project Closed

Judson Independent School District Gymnasium HVAC Upgrades Phase 2 is a renovation/alteration project at 7027 Misty Ridge Dr, Converse, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $308K across about 5,000 sq ft.

Estimated project value
$308K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$62/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 20, 2024468 days across supplied datesDec 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    103 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78109 (Converse)

One email per change. Unsubscribe in one click. Privacy.

Judson Independent School District Gymnasium HVAC Upgrades Phase 2 is a Renovation/Alteration project located at 7027 Misty Ridge Dr, Converse, TX 78109 in Converse, Texas. The project has an estimated value of $308K covering 5,000 sq ft. Judson Independent School District is the property owner and Cleary Zimmermann Engineers is the design firm of record. The project was registered with TDLR on August 20, 2024.

Frequently Asked Questions

What is Judson Independent School District Gymnasium HVAC Upgrades Phase 2?

Judson Independent School District Gymnasium HVAC Upgrades Phase 2 is a renovation/alteration project at 7027 Misty Ridge Dr in Converse, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolish existing unit heaters and ventilation fans in gym. Install ground mounted RTU outside gym and route ductwork inside gym to provide cooling. Provide concrete slab and fencing around RTU. 5000 sqft.

Is Judson Independent School District Gymnasium HVAC Upgrades Phase 2 open in Converse?

Construction on Judson Independent School District Gymnasium HVAC Upgrades Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.

Where is Judson Independent School District Gymnasium HVAC Upgrades Phase 2 located?

Judson Independent School District Gymnasium HVAC Upgrades Phase 2 is located at 7027 Misty Ridge Dr, Converse, TX, 78109, in Bexar County.

Who is the owner or developer of Judson Independent School District Gymnasium HVAC Upgrades Phase 2?

Judson Independent School District is the property owner/developer of record for Judson Independent School District Gymnasium HVAC Upgrades Phase 2, per its TDLR project registration.

Who is the architect or design firm for Judson Independent School District Gymnasium HVAC Upgrades Phase 2?

Cleary Zimmermann Engineers is the design firm of record for Judson Independent School District Gymnasium HVAC Upgrades Phase 2, according to its TDLR filing.

How much does Judson Independent School District Gymnasium HVAC Upgrades Phase 2 cost and how big is it?

Judson Independent School District Gymnasium HVAC Upgrades Phase 2 has an estimated construction value of $308K and approximately 5,000 square feet (about $62/sqft), based on its TDLR filing.

Scope of Work

Demolish existing unit heaters and ventilation fans in gym. Install ground mounted RTU outside gym and route ductwork inside gym to provide cooling. Provide concrete slab and fencing around RTU. 5000 sqft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7027 Misty Ridge Dr, Converse, TX, 78109

Location by street address

Watch all construction in 78109 (Converse)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Converse?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.