Project intelligenceTDLR TABS2024025916Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DISD - David W. Carter HS Black Box Addition in Dallas, TX

1819 Wheatland Road, Dallas, TX, 75232

Construction complete · Aug 2026Inspection Complete

DISD - David W. Carter HS Black Box Addition is a renovation/alteration project at 1819 Wheatland Road, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $6.3M across about 8,000 sq ft.

Estimated project value
$6.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$792/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 20, 2024714 days across supplied datesAug 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    134 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    396 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About DISD - David W. Carter HS Black Box Addition

The Dallas Independent School District completed a $6,336,476 renovation and addition project at David W. Carter High School, located at 1819 Wheatland Road in Dallas. The work, filed as the DISD - David W. Carter HS Black Box Addition, added a new two-story structure of 8,000 square feet to the existing campus. This expansion includes a dedicated Black Box theater and a Dance Studio, alongside interior renovations to select existing spaces.

PBK Architects, Inc. served as the design firm of record for this project. The construction timeline began in January 2025, following the registration and plan review completed in August 2024. The project passed its final TDLR accessibility inspection in August 2026, marking the completion of the scheduled build window.

This project represents a significant investment in school infrastructure, with an estimated cost of $792 per square foot. This figure is above the county median of $73 per square foot for similar renovation and alteration filings in Dallas County. The total project cost is also above the median estimated cost for such projects in the region, placing it in the top quarter of comparable filings by value.

Dallas ISD has registered six other projects with TDLR, totaling $2,861,365. These include renovations at Victor H Hexter Elementary School and other educational facilities in the Dallas area. PBK Architects, Inc. has also been involved in larger projects, such as the Little Elm High School addition, which is valued at $53,000,000. The Carter High School project fits within a broader pattern of district-wide improvements to school facilities.

The surrounding area, ZIP code 75232, has a population of approximately 32,967 residents. The median household income in this Census area is $57,315, and the median owner-occupied home value is $207,000. These figures provide context for the community in which the new Black Box and Dance Studio now operate.

Project Details

The registered accessibility specialist for this project was Glenn Thomas Comtois. The project involved public funds and public land, adhering to federal and state accessibility standards. The final inspection confirms that the new 8,000-square-foot addition meets all required accessibility guidelines.

Regional Context

Other registered projects in the immediate area include Martin Weiss Elementary School and Stoneridge 20. These projects vary in type, ranging from additions to new construction. The Dallas County labor market remained stable during the construction period, with an unemployment rate of 3 percent in August 2026.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75232 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

DISD - David W. Carter HS Black Box Addition is a Renovation/Alteration project located at 1819 Wheatland Road, Dallas, TX 75232 in Dallas, Texas. The project has an estimated value of $6.3M covering 8,000 sq ft. Dallas ISD is the property owner and PBK Architects, Inc. is the design firm of record. The project was registered with TDLR on August 20, 2024.

Frequently Asked Questions

Is the David W. Carter High School addition complete?

Yes, construction is complete. The project passed its final TDLR accessibility inspection in August 2026, confirming that the new 8,000-square-foot addition and renovations are finished.

What facilities were added to the school?

The project added a two-story 8,000-square-foot structure containing a Black Box theater and a Dance Studio. It also included interior renovations to select existing spaces within the high school.

Who designed the project?

PBK Architects, Inc. was the design firm of record for this project. They were responsible for the architectural plans for the new addition and the associated interior renovations.

How much did the project cost?

The estimated cost for the renovation and addition was $6,336,476. This works out to approximately $792 per square foot for the 8,000 square feet of new construction.

Is the school open to the public?

The TDLR record confirms that construction is complete and the final accessibility inspection was passed in August 2026. It does not specify public opening hours or operational status for the new facilities.

What is DISD - David W. Carter HS Black Box Addition?

DISD - David W. Carter HS Black Box Addition is a renovation/alteration project at 1819 Wheatland Road in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2-Story 8,000 sqft addition of a Black Box and Dance Studio to an existing High School, Interior renovations to select spaces.

Is DISD - David W. Carter HS Black Box Addition open in Dallas?

Construction on DISD - David W. Carter HS Black Box Addition is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is DISD - David W. Carter HS Black Box Addition located?

DISD - David W. Carter HS Black Box Addition is located at 1819 Wheatland Road, Dallas, TX, 75232, in Dallas County.

Who is the owner or developer of DISD - David W. Carter HS Black Box Addition?

Dallas ISD is the property owner/developer of record for DISD - David W. Carter HS Black Box Addition, per its TDLR project registration.

Who is the architect or design firm for DISD - David W. Carter HS Black Box Addition?

PBK Architects, Inc. is the design firm of record for DISD - David W. Carter HS Black Box Addition, according to its TDLR filing.

How much does DISD - David W. Carter HS Black Box Addition cost and how big is it?

DISD - David W. Carter HS Black Box Addition has an estimated construction value of $6.3M and approximately 8,000 square feet (about $792/sqft), based on its TDLR filing.

Scope of Work

New 2-Story 8,000 sqft addition of a Black Box and Dance Studio to an existing High School, Interior renovations to select spaces.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1819 Wheatland Road, Dallas, TX, 75232

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75232 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.