Project intelligenceTDLR TABS2024025953Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2022 CDBG-CDM Downtown Sidewalk Improvements in San Augustine, TX

West Columbia Street, San Augustine, TX, 75972

Construction complete · Jun 2026Project Closed

2022 CDBG-CDM Downtown Sidewalk Improvements is a renovation/alteration project at West Columbia Street, San Augustine, in San Augustine County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $407K across about 1,000 sq ft.

Estimated project value
$407K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$407/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 21, 2024675 days across supplied datesJun 27, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    72 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    326 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    126 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 2022 CDBG-CDM Downtown Sidewalk Improvements

The City of San Augustine completed a renovation of approximately 1,000 square feet of sidewalks along West Columbia Street in downtown San Augustine. This project, identified in filings as the 2022 CDBG-CDM Downtown Sidewalk Improvements, involved alteration work on public land with an estimated cost of $407,000. The construction was registered with TDLR in August 2024, and the accessibility review process concluded when TDLR closed the project file in June 2026.

KSA served as the design firm of record, while James Chesley Fancher was the registered accessibility specialist. The scope of work focused specifically on the renovation of the sidewalk infrastructure, which is a critical component for pedestrian access in the downtown area. The project utilized public funds and was classified as a renovation/alteration type of work under Texas accessibility standards.

Project Timeline and Financials

Construction began in November 2024, following the completion of plan review in August 2024. The scheduled build window was 151 days, which is longer than the county median of 92 days for similar renovation projects. The estimated cost of $407,000 places this project above the county median estimated cost of $350,000 for renovation/alteration filings in San Augustine County. The cost per square foot was $407, significantly higher than the county median of $102 per square foot.

The final inspection passed in February 2026, confirming that the work met the required accessibility standards. This successful inspection preceded the formal closure of the TDLR file. The project is part of a broader set of accessibility improvements designed by KSA, which has been involved in six other TDLR-registered projects in the region totaling $2,712,000.

San Augustine, located in San Augustine County, has a population of about 5,896 according to U.S. Census ACS 2023 five-year estimates for ZIP 75972. The median household income in this area is $42,693, and the median owner-occupied home value is $76,700. The San Augustine County unemployment rate was 5.3 percent in August 2026, lower than a year earlier, reflecting a stable local labor market during the project's construction phase.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75972 (San Augustine)

One email per change. Unsubscribe in one click. Privacy.

2022 CDBG-CDM Downtown Sidewalk Improvements is a Renovation/Alteration project located at West Columbia Street, San Augustine, TX 75972 in San Augustine, Texas. The project has an estimated value of $407K covering 1,000 sq ft. City of San Augustine is the property owner and KSA is the design firm of record. The project was registered with TDLR on August 21, 2024.

Frequently Asked Questions

Is the sidewalk project finished?

Yes, the project is complete. The final inspection passed in February 2026, and TDLR closed the project file in June 2026, marking the end of the accessibility review process.

Who designed the sidewalk improvements?

KSA was the design firm of record for the project. James Chesley Fancher served as the registered accessibility specialist for the renovation work.

How much did the project cost?

The estimated cost for the renovation of approximately 1,000 square feet of sidewalks was $407,000. This figure is above the county median for similar renovation projects.

When did construction start and end?

Construction started in November 2024. The final inspection passed in February 2026, and the TDLR file was closed in June 2026.

What is 2022 CDBG-CDM Downtown Sidewalk Improvements?

2022 CDBG-CDM Downtown Sidewalk Improvements is a renovation/alteration project at West Columbia Street in San Augustine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of approximately 1,000 square feet of sidewalks

Is 2022 CDBG-CDM Downtown Sidewalk Improvements open in San Augustine?

Construction on 2022 CDBG-CDM Downtown Sidewalk Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is 2022 CDBG-CDM Downtown Sidewalk Improvements located?

2022 CDBG-CDM Downtown Sidewalk Improvements is located at West Columbia Street, San Augustine, TX, 75972, in San Augustine County.

Who is the owner or developer of 2022 CDBG-CDM Downtown Sidewalk Improvements?

City of San Augustine is the property owner/developer of record for 2022 CDBG-CDM Downtown Sidewalk Improvements, per its TDLR project registration.

Who is the architect or design firm for 2022 CDBG-CDM Downtown Sidewalk Improvements?

KSA is the design firm of record for 2022 CDBG-CDM Downtown Sidewalk Improvements, according to its TDLR filing.

How much does 2022 CDBG-CDM Downtown Sidewalk Improvements cost and how big is it?

2022 CDBG-CDM Downtown Sidewalk Improvements has an estimated construction value of $407K and approximately 1,000 square feet (about $407/sqft), based on its TDLR filing.

Scope of Work

Renovation of approximately 1,000 square feet of sidewalks

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

West Columbia Street, San Augustine, TX, 75972

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75972 (San Augustine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Augustine?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.