2022 CDBG Downtown Sidewalk Improvements in Grapeland, TX

N. Main and S. Main Streets, Grapeland, TX, 75844

Construction complete · Aug 2026Inspection Complete

2022 CDBG Downtown Sidewalk Improvements is a renovation/alteration project at N. Main and S. Main Streets, Grapeland, in Houston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $472K across about 81,900 sq ft.

Estimated project value
$472K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
81,900 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 11, 2024714 days across supplied datesAug 26, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    512 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 2022 CDBG Downtown Sidewalk Improvements

The City of Grapeland completed a renovation of approximately 9,100 square yards of sidewalks along N. Main and S. Main Streets in Grapeland, TX 75844. This project, filed as the 2022 CDBG Downtown Sidewalk Improvements, involved the alteration of public right-of-way infrastructure within Houston County. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2024, marking the formal start of the compliance review process for this public improvement initiative.

The estimated cost for this renovation was $472,000, covering a total area of 81,900 square feet. This places the project's cost per square foot at $6, a figure that is below the Houston County median of $87 for similar renovation and alteration filings. The total estimated cost is above the county median of $265,000 for this project type, reflecting the significant scale of the sidewalk network being improved in the downtown core.

Design and Construction Details

KSA served as the design firm of record for this project. The registered accessibility specialist was James Chesley Fancher. The filing indicated a construction start date of November 2024, with a scheduled completion date of April 2025. The project involved public funds and public land, qualifying it as a Federally funded roadway project under the TDLR accessibility standards.

The project passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete. The TDLR status is listed as Inspection Complete. This timeline aligns with the scheduled build window of 151 days, which is longer than the Houston County median of 119 days for comparable projects. KSA has been the design firm for six other TDLR-registered projects in the region, including improvements in San Augustine, Wortham, Carthage, Mount Pleasant, and Cleveland, totaling $2,647,000 in estimated costs.

Other recent registered projects in the Grapeland area include a new construction project for a Dollar General store, additions to the Grapeland ISD High School, and renovations at Cutshaw Chevrolet and Grapeland State Bank. These projects reflect ongoing development and infrastructure updates in the community, which has a population of about 5,004 according to U.S. Census estimates for ZIP code 75844.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75844 (Grapeland)

One email per change. Unsubscribe in one click. Privacy.

2022 CDBG Downtown Sidewalk Improvements is a Renovation/Alteration project located at N. Main and S. Main Streets, Grapeland, TX 75844 in Grapeland, Texas. The project has an estimated value of $472K covering 81,900 sq ft. City of Grapeland is the property owner and KSA is the design firm of record. The project was registered with TDLR on September 11, 2024.

Frequently Asked Questions

Is the sidewalk renovation complete?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete, indicating that the construction phase has finished and the work meets accessibility standards.

Who designed the Grapeland sidewalk project?

KSA was the design firm of record. James Chesley Fancher served as the registered accessibility specialist for this renovation of approximately 9,100 square yards of sidewalks.

How much did the project cost?

The estimated cost was $472,000. This is above the Houston County median for similar renovations but results in a cost per square foot of $6, which is below the county median.

Where exactly was the work done?

The renovation took place on N. Main and S. Main Streets in Grapeland, TX 75844. The scope covered approximately 9,100 square yards of sidewalks in the downtown area.

When did construction start and finish?

Construction started in November 2024. The final TDLR accessibility inspection was passed in August 2026, marking the completion of the project.

What is 2022 CDBG Downtown Sidewalk Improvements?

2022 CDBG Downtown Sidewalk Improvements is a renovation/alteration project at N. Main and S. Main Streets in Grapeland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of approximately 9,100 square yards of sidewalks

Is 2022 CDBG Downtown Sidewalk Improvements open in Grapeland?

Construction on 2022 CDBG Downtown Sidewalk Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is 2022 CDBG Downtown Sidewalk Improvements located?

2022 CDBG Downtown Sidewalk Improvements is located at N. Main and S. Main Streets, Grapeland, TX, 75844, in Houston County.

Who is the owner or developer of 2022 CDBG Downtown Sidewalk Improvements?

City of Grapeland is the property owner/developer of record for 2022 CDBG Downtown Sidewalk Improvements, per its TDLR project registration.

Who is the architect or design firm for 2022 CDBG Downtown Sidewalk Improvements?

KSA is the design firm of record for 2022 CDBG Downtown Sidewalk Improvements, according to its TDLR filing.

How much does 2022 CDBG Downtown Sidewalk Improvements cost and how big is it?

2022 CDBG Downtown Sidewalk Improvements has an estimated construction value of $472K and approximately 81,900 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

Renovation of approximately 9,100 square yards of sidewalks

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

N. Main and S. Main Streets, Grapeland, TX, 75844

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75844 (Grapeland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grapeland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.