Project intelligenceTDLR TABS2024026025Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Memorial Hermann Southwest Hospital MRI Equipment Exchange in Houston, TX

7600 Beechnut St., Houston, TX, 77074

Construction complete · Jun 2025Project Closed

Memorial Hermann Southwest Hospital MRI Equipment Exchange is a renovation/alteration project at 7600 Beechnut St., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2025). The project has an estimated value of $600K across about 1,375 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,375 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$436/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 22, 2024298 days across supplied datesJun 16, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    53 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77074 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Memorial Hermann Southwest Hospital MRI Equipment Exchange is a Renovation/Alteration project located at 7600 Beechnut St., Houston, TX 77074 in Houston, Texas. The project has an estimated value of $600K covering 1,375 sq ft. Memorial Hermann is the property owner and BSA-Architects, Inc. is the design firm of record. The project was registered with TDLR on August 22, 2024.

Frequently Asked Questions

What is Memorial Hermann Southwest Hospital MRI Equipment Exchange?

Memorial Hermann Southwest Hospital MRI Equipment Exchange is a renovation/alteration project at 7600 Beechnut St. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodeling of approximately 1,375 S.F. of an existing Hospital Radiology Department on the first floor, to exchange the MRI Scanner. Interior Remodeling Only.

Is Memorial Hermann Southwest Hospital MRI Equipment Exchange open in Houston?

Construction on Memorial Hermann Southwest Hospital MRI Equipment Exchange is complete — TDLR records show the project passed its required accessibility inspection in Jun 2025. The building is finished and very likely open.

Where is Memorial Hermann Southwest Hospital MRI Equipment Exchange located?

Memorial Hermann Southwest Hospital MRI Equipment Exchange is located at 7600 Beechnut St., Houston, TX, 77074, in Harris County.

Who is the owner or developer of Memorial Hermann Southwest Hospital MRI Equipment Exchange?

Memorial Hermann is the property owner/developer of record for Memorial Hermann Southwest Hospital MRI Equipment Exchange, per its TDLR project registration.

Who is the architect or design firm for Memorial Hermann Southwest Hospital MRI Equipment Exchange?

BSA-Architects, Inc. is the design firm of record for Memorial Hermann Southwest Hospital MRI Equipment Exchange, according to its TDLR filing.

How much does Memorial Hermann Southwest Hospital MRI Equipment Exchange cost and how big is it?

Memorial Hermann Southwest Hospital MRI Equipment Exchange has an estimated construction value of $600K and approximately 1,375 square feet (about $436/sqft), based on its TDLR filing.

Scope of Work

Interior remodeling of approximately 1,375 S.F. of an existing Hospital Radiology Department on the first floor, to exchange the MRI Scanner. Interior Remodeling Only.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7600 Beechnut St., Houston, TX, 77074

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

7600 BEECHNUT ST, Houston, TX 77074

875 SF HOSPITAL REMODEL 1-12-1-I2-A SPK '21 IBC

IssuedBuilding PmtMar 2026
HOU-25102275-BUILDINGPMT

Watch all construction in 77074 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.