Project intelligenceTDLR TABS2024026125Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 in Plano, TX

MULTIPLE LOCATIONS, Plano, TX, 75086

Construction complete · Oct 2026Inspection Complete

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 is a renovation/alteration project at MULTIPLE LOCATIONS, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $320K across about 18,000 sq ft.

Estimated project value
$320K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$18/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 22, 2024890 days across supplied datesJan 29, 2027

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    71 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    708 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062

The City of Plano completed a concrete pavement repair project across multiple locations in the southwest area of the city. This renovation and alteration work, filed under the name Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062, involved repairing 1,800 square feet of sidewalk and 56 linear feet of curb. The project is located in Plano, Texas 75086, within Collin County. It passed its final TDLR accessibility inspection in October 2026, confirming that construction is complete.

The estimated cost for this project was $320,000. With a total project size of 18,000 square feet, the cost amounted to $18 per square foot. This figure is below the county median of $78 per square foot for similar renovation and alteration filings in Collin County. The total estimated cost is above the county median of $220,000 for this type of work. The scheduled build window was 819 days, which is longer than the county median of 92 days for comparable projects.

Project Ownership and Design

The City of Plano served as both the owner and the design firm of record for this project. Brandon Mark Quimbey was the registered accessibility specialist associated with the filing. The project involved public funds and public land. It was registered with TDLR in August 2024, and plan review was completed in the same month. Construction began in November 2024, with a scheduled completion date of January 2027. The final inspection was passed in October 2026, ahead of the scheduled completion date.

The City of Plano has several other TDLR-registered projects in the area, including improvements to Parkwood Blvd. and the Cottonbelt Trail. These other projects have estimated costs ranging from $600,000 to $18,408,414. The City of Plano also has projects with other design firms, such as Contract - 2025 PW-S-00042 and PH 2 PWS 00030. These projects vary in status, with some registered and others with review complete. The presence of multiple projects indicates ongoing infrastructure and renovation efforts in Plano.

Local Context and Labor Market

Other registered projects in the same area include renovations at 117 Central Expy, Chick-fil-A, and Ruisseau Village Phase 2. These projects are also classified as renovation or alteration work. The Collin County unemployment rate was 4.4 percent in August 2026, which is lower than a year earlier. This labor market context reflects the broader economic conditions in the region during the project's construction period.

The project's completion and final inspection mark the end of the construction phase. The City of Plano has successfully delivered this concrete pavement repair project, meeting the accessibility standards required by TDLR. The project's cost and size are consistent with the county's median values for similar work, though the build window was longer than average. The involvement of public funds and the City of Plano as both owner and designer underscores the municipal commitment to infrastructure maintenance.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75086 (Plano)

One email per change. Unsubscribe in one click. Privacy.

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 is a Renovation/Alteration project located at MULTIPLE LOCATIONS, Plano, TX 75086 in Plano, Texas. The project has an estimated value of $320K covering 18,000 sq ft. CITY OF PLANO is the property owner and CITY OF PLANO is the design firm of record. The project was registered with TDLR on August 22, 2024.

Frequently Asked Questions

Is the project complete?

Yes, the project passed its final TDLR accessibility inspection in October 2026, confirming that construction is complete.

Who owned and designed the project?

The City of Plano served as both the owner and the design firm of record.

What was the scope of the work?

The work involved repairing 1,800 square feet of sidewalk and 56 linear feet of curb.

When did construction start and finish?

Construction began in November 2024, and the final inspection was passed in October 2026.

What is Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062?

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 is a renovation/alteration project at MULTIPLE LOCATIONS in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1800 SQFT SIDEWALK AND 56 BFR

Is Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 open in Plano?

Construction on Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 located?

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 is located at MULTIPLE LOCATIONS, Plano, TX, 75086, in Collin County.

Who is the owner or developer of Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062?

CITY OF PLANO is the property owner/developer of record for Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062, per its TDLR project registration.

Who is the architect or design firm for Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062?

CITY OF PLANO is the design firm of record for Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062, according to its TDLR filing.

How much does Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 cost and how big is it?

Residential Concrete Pavement Repair Zone G4 Southwest PW-S-00062 has an estimated construction value of $320K and approximately 18,000 square feet (about $18/sqft), based on its TDLR filing.

Scope of Work

1800 SQFT SIDEWALK AND 56 BFR

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

MULTIPLE LOCATIONS, Plano, TX, 75086

Location by street address

Watch all construction in 75086 (Plano)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.