Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
SH 105 (CSJ: 0315-04-087, etc.) in Navasota, TX
Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St, Navasota, TX, 77868
SH 105 (CSJ: 0315-04-087, etc.) is a new construction project at Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St, Navasota, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.2M across about 24,891 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 24,891 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $46/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
119 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
181 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
465 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SH 105 (CSJ: 0315-04-087, etc.)
CSJ: 0315-04-087, etc. is complete. The project, filed as SH 105 (CSJ: 0315-04-087, etc.), passed its final TDLR accessibility inspection in October 2026. TxDOT District: Bryan finished the new construction of curb ramps, sidewalks, and miscellaneous pedestrian elements along a 24,891 sq ft corridor in Navasota.
The work covered two specific segments: from 3rd St to 7th St, and from 7th St to 9th St. The estimated cost for this project was $1,152,600. The scheduled build window was 181 days, which is shorter than the county median of 243 days for similar new construction filings in Grimes County.
Project Details and Cost Efficiency
The cost per square foot for CSJ: 0315-04-087, etc. was $46, a figure below the county median of $120 per square foot. While the total estimated cost is close to the county median of $1,167,240, the lower unit cost reflects the scope of work. The project focused strictly on pedestrian accessibility elements rather than full roadway reconstruction.
TxDOT District: Bryan is the owner of record for this project. The agency has six other TDLR-registered projects totaling $15,467,672, including work in Caldwell, Thorndale, Brenham, and Bryan. This Navasota project fits within a broader pattern of infrastructure maintenance and improvement across the region. The funding source involves public funds, public land, or is a Federally funded roadway project.
Frank Fonseca served as the registered accessibility specialist for the project. The registration with TDLR and plan review were both completed in September 2024. Construction officially started in January 2025, with a completion date on the filing listed for July 2025. The final inspection passed in October 2026, confirming that all accessibility standards were met before the project was closed out.
Navasota is located in Grimes County, with a ZIP code 77868 population of about 18,863. The median household income in this area is $61,949, and the median owner-occupied home value is $200,400. The Grimes County unemployment rate was 5 percent in August 2026, lower than a year earlier. This infrastructure investment supports the local community by improving safe and accessible pedestrian movement along a key state highway corridor.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77868 (Navasota)
One email per change. Unsubscribe in one click. Privacy.
SH 105 (CSJ: 0315-04-087, etc.) is a New Construction project located at Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St, Navasota, TX 77868 in Navasota, Texas. The project has an estimated value of $1.2M covering 24,891 sq ft. TxDOT District: Bryan is the property owner. The project was registered with TDLR on September 5, 2024.
Frequently Asked Questions
Is the construction complete?
Yes, the project passed its final TDLR accessibility inspection in October 2026. The TDLR status is Inspection Complete, indicating that all work is finished and verified.
What was the total cost of the project?
The estimated cost for the new construction of curb ramps and sidewalks was $1,152,600. This figure is close to the county median for similar new construction filings.
Who is responsible for the project?
TxDOT District: Bryan is the owner of record. Frank Fonseca was the registered accessibility specialist. The project involves public funds or is a Federally funded roadway project.
What specific work was done?
The scope included the construction of curb ramps, sidewalks, and miscellaneous pedestrian elements. The work covered segments from 3rd St to 7th St and 7th St to 9th St.
How long did the construction take?
Construction started in January 2025. The scheduled build window was 181 days. The final inspection was passed in October 2026, confirming completion.
What is SH 105 (CSJ: 0315-04-087, etc.)?
SH 105 (CSJ: 0315-04-087, etc.) is a new construction project at Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St in Navasota, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of curb ramps, sidewalks, and miscellaneous pedestrian elements.
Is SH 105 (CSJ: 0315-04-087, etc.) open in Navasota?
Construction on SH 105 (CSJ: 0315-04-087, etc.) is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is SH 105 (CSJ: 0315-04-087, etc.) located?
SH 105 (CSJ: 0315-04-087, etc.) is located at Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St, Navasota, TX, 77868, in Grimes County.
Who is the owner or developer of SH 105 (CSJ: 0315-04-087, etc.)?
TxDOT District: Bryan is the property owner/developer of record for SH 105 (CSJ: 0315-04-087, etc.), per its TDLR project registration.
How much does SH 105 (CSJ: 0315-04-087, etc.) cost and how big is it?
SH 105 (CSJ: 0315-04-087, etc.) has an estimated construction value of $1.2M and approximately 24,891 square feet (about $46/sqft), based on its TDLR filing.
Scope of Work
Construction of curb ramps, sidewalks, and miscellaneous pedestrian elements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Fr.: 3rd St To: 7th St & Fr.: 7th St To: 9th St, Navasota, TX, 77868
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77868 (Navasota)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Navasota?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.