Project intelligenceTDLR TABS2025001086New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Pomona - East Mustang Bayou Landscape in Manvel, TX

Pomona Parkway and Kirby Drive, Manvel, TX, 77578

Construction complete · Oct 2026Project Closed

Pomona - East Mustang Bayou Landscape is a new construction project at Pomona Parkway and Kirby Drive, Manvel, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $147K across about 18,170 sq ft.

Estimated project value
$147K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,170 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 2024775 days across supplied datesOct 31, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    120 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    513 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Pomona - East Mustang Bayou Landscape

The Pomona project, specifically the East Mustang Bayou Landscape component, is located at Pomona Parkway and Kirby Drive in Manvel, Brazoria County. This new construction filing involves 18,170 square feet of sidewalk work. The estimated cost for this scope is $146,553, which calculates to $8 per square foot. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the Texas Accessibility Standards (TABS) program.

Pomona Phase 6, LLC is the owner and developer of record for this site. TBG Partners served as the design firm of record for the accessibility elements. Laura Fulkerson is the registered accessibility specialist associated with the filing. The project involves public funds, public land, or is a Federally funded roadway project, which triggers specific regulatory requirements.

The timeline for this construction began in September 2024. The plan review was completed in September 2024, and construction started that same month. The completion date listed on the original filing was January 2025. However, the final inspection did not pass until June 2026. This delay indicates that the initial schedule was not met, and additional time was required to bring the work into compliance with state accessibility codes.

When compared to other new construction filings in Brazoria County, this project is significantly smaller. The median estimated cost for 1,482 new construction filings in the county is $800,000, with the middle half ranging from $300,000 to $2,000,000. The median size is 9,103 square feet, and the median cost per square foot is $119. This project's cost is below the county median for its type, sitting in the bottom quarter. Its scheduled build window of 120 days is shorter than the county median of 226 days. The $8 per square foot figure is also well below the county median of $119.

Pomona Phase 6, LLC has two other TDLR-registered projects in Manvel, totaling $191,976. Both of those projects are also closed. TBG Partners has six other TDLR-registered projects, including work in Magnolia, Houston, and Richmond, with costs ranging from $103,902 to $1,489,823. The area profile for ZIP code 77578 shows a population of about 27,195 and a median household income of $132,571. Housing is predominantly owner-occupied, with a median owner-occupied home value of $359,500.

Although the filing indicated a completion date of January 2025, the regulatory process extended well beyond that. TDLR closed the project file in October 2026, which marks the end of the accessibility review process for this construction. The project status is officially closed. The Brazoria County unemployment rate was 5.1 percent in August 2026, lower than a year earlier. This project represents a small but compliant addition to the local infrastructure, verified through the rigorous TABS registration process.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77578 (Manvel)

One email per change. Unsubscribe in one click. Privacy.

Pomona - East Mustang Bayou Landscape is a New Construction project located at Pomona Parkway and Kirby Drive, Manvel, TX 77578 in Manvel, Texas. The project has an estimated value of $147K covering 18,170 sq ft. Pomona Phase 6, LLC is the property owner and TBG Partners is the design firm of record. The project was registered with TDLR on September 16, 2024.

Frequently Asked Questions

Is the Pomona sidewalk project open for business?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project status is closed, meaning the accessibility review is complete, but this does not confirm business operations.

Who is the design firm for this project?

TBG Partners is the design firm of record for the Pomona project in Manvel. They have registered six other TDLR projects in Texas, including work in Houston and Richmond.

What is the total cost of the sidewalk work?

The estimated cost for the 18,170 square feet of sidewalk work is $146,553. This results in a cost of $8 per square foot, which is below the county median.

When was the final inspection passed?

The final inspection passed in June 2026. This was well after the filing's initial completion date of January 2025, leading to the project file closing in October 2026.

Where is the Pomona project located?

The project is located at Pomona Parkway and Kirby Drive in Manvel, Brazoria County, Texas. The ZIP code is 77578.

What is Pomona - East Mustang Bayou Landscape?

Pomona - East Mustang Bayou Landscape is a new construction project at Pomona Parkway and Kirby Drive in Manvel, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk (18170 SF)

Is Pomona - East Mustang Bayou Landscape open in Manvel?

Construction on Pomona - East Mustang Bayou Landscape is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Pomona - East Mustang Bayou Landscape located?

Pomona - East Mustang Bayou Landscape is located at Pomona Parkway and Kirby Drive, Manvel, TX, 77578, in Brazoria County.

Who is the owner or developer of Pomona - East Mustang Bayou Landscape?

Pomona Phase 6, LLC is the property owner/developer of record for Pomona - East Mustang Bayou Landscape, per its TDLR project registration.

Who is the architect or design firm for Pomona - East Mustang Bayou Landscape?

TBG Partners is the design firm of record for Pomona - East Mustang Bayou Landscape, according to its TDLR filing.

How much does Pomona - East Mustang Bayou Landscape cost and how big is it?

Pomona - East Mustang Bayou Landscape has an estimated construction value of $147K and approximately 18,170 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

Sidewalk (18170 SF)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Pomona Parkway and Kirby Drive, Manvel, TX, 77578

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77578 (Manvel)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.