Project intelligenceTDLR TABS2025003315New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Harrell Parkway Phase A.2

Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol, Round Rock, TX, 78665

Target date passed (Oct 2025)Review Complete

Harrell Parkway Phase A.2 is a new construction project at Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $7.6M across about 38,527 sq ft.

Estimated project value
$7.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
38,527 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$196/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 16, 2024357 days across supplied datesOct 8, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    293 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78665 (Round Rock)

One email per change. Unsubscribe in one click. Privacy.

Harrell Parkway Phase A.2 is a New Construction project located at Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $7.6M covering 38,527 sq ft. City of Round Rock - Transportation Dept. is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on October 16, 2024.

Frequently Asked Questions

What is Harrell Parkway Phase A.2?

Harrell Parkway Phase A.2 is a new construction project at Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway reconstruction, 10-ft shared-use path, drainage improvements, utility relocations, sidewalk, pavement markings, and landscape. 38,527 square feet of shared-use path.

Is Harrell Parkway Phase A.2 open in Round Rock?

Harrell Parkway Phase A.2 was scheduled to finish construction in Oct 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Harrell Parkway Phase A.2 located?

Harrell Parkway Phase A.2 is located at Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol, Round Rock, TX, 78665, in Williamson County.

Who is the owner or developer of Harrell Parkway Phase A.2?

City of Round Rock - Transportation Dept. is the property owner/developer of record for Harrell Parkway Phase A.2, per its TDLR project registration.

Who is the architect or design firm for Harrell Parkway Phase A.2?

Kimley-Horn is the design firm of record for Harrell Parkway Phase A.2, according to its TDLR filing.

How much does Harrell Parkway Phase A.2 cost and how big is it?

Harrell Parkway Phase A.2 has an estimated construction value of $7.6M and approximately 38,527 square feet (about $196/sqft), based on its TDLR filing.

Scope of Work

Roadway reconstruction, 10-ft shared-use path, drainage improvements, utility relocations, sidewalk, pavement markings, and landscape. 38,527 square feet of shared-use path.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Harrell Pkwy US 79 to Whitlow Way, Aten Loop to Ol, Round Rock, TX, 78665

Location by street address

Watch all construction in 78665 (Round Rock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Round Rock?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.