Funding type
This project is privately funded, on private land for private use.
TikTok Austin Phase 3
300 Colorado Street Level 32, Austin, TX, 78701
TikTok Austin Phase 3 is a renovation/alteration project at 300 Colorado Street Level 32, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2025). The project has an estimated value of $350K across about 2,110 sq ft.
- Estimated project value
- $350K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,110 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $166/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
14 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
119 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About TikTok Austin Phase 3
TikTok Austin Phase 3 is a completed renovation on Level 32 of 300 Colorado Street in Austin, Texas. The project involved converting a receptionist area into office space within a 2,110 sq ft footprint. The estimated cost for this work was $350,000. TDLR closed the project file in February 2025, which marks the end of the accessibility review process for this construction.
The scope of work included minor demolition and the construction of non-structural partitions, ceilings, finishes, and furniture or equipment. It also covered associated mechanical, electrical, and plumbing improvements. The filing specified that no new access control systems were added. The work is classified as a renovation or alteration project.
Cousins Properties Incorporated is the owner of record for this project. Interior Architects served as the design firm. Joshua T Ronson is the registered accessibility specialist associated with the filing. The project was registered with TDLR in October 2024. Construction began in November 2024, with a scheduled completion date of February 2025.
Project Context and Comparisons
This project is privately funded on private land. The estimated cost of $350,000 is above the county median for renovation and alteration filings in Travis County, which is $300,000. The size of 2,110 sq ft is below the county median of 3,800 sq ft. The cost per square foot was $166, which is above the county median of $103 per square foot.
The scheduled build window for this project was 119 days. This is close to the county median scheduled build window of 98 days for similar projects in Travis County. Cousins Properties Incorporated has one other TDLR-registered project in Austin at One Congress Plaza, which cost $105,400 and is also closed. Interior Architects has six other registered projects, including work at Total Energies Tower in Houston and 301 Congress in Austin.
City of Austin permit records show 15 permits on file at this street address. These were issued between February 2024 and October 2026. The permit types include electrical, mechanical, building, and plumbing permits. Twelve of these permits have a final status.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78701 (Austin)
One email per change. Unsubscribe in one click. Privacy.
TikTok Austin Phase 3 is a Renovation/Alteration project located at 300 Colorado Street Level 32, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $350K covering 2,110 sq ft. Cousins Properties Incorporated is the property owner and Interior Architects is the design firm of record. The project was registered with TDLR on October 18, 2024.
Frequently Asked Questions
Is TikTok Austin Phase 3 finished?
Yes. TDLR closed the project file in February 2025. This indicates the accessibility review process for the construction work is complete.
What was the scope of the renovation?
The work converted a receptionist area to office space. It included minor demolition, non-structural partitions, ceilings, finishes, furniture, and MEP improvements. No new access control was added.
Who owns the building and designed the project?
Cousins Properties Incorporated is the owner of record. Interior Architects is the design firm of record for this renovation project.
How much did the project cost?
The estimated cost was $350,000. This breaks down to $166 per square foot for the 2,110 sq ft area renovated on Level 32.
Is the business open now?
The TDLR record confirms the construction file is closed. It does not provide information regarding the business opening status or operational hours.
What is TikTok Austin Phase 3?
TikTok Austin Phase 3 is a renovation/alteration project at 300 Colorado Street Level 32 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TENANT IMPROVEMENT ON FLOOR 32 TO CONVERT RECEPTIONIST AREA TO OFFICE SPACE. INCLUDING MINOR DEMOLITION AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, CEILINGS, FINISHES AND FURNITURE/EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. NO NEW ACC…
Is TikTok Austin Phase 3 open in Austin?
Construction on TikTok Austin Phase 3 is complete — TDLR records show the project passed its required accessibility inspection in Feb 2025. The building is finished and very likely open.
Where is TikTok Austin Phase 3 located?
TikTok Austin Phase 3 is located at 300 Colorado Street Level 32, Austin, TX, 78701, in Travis County.
Who is the owner or developer of TikTok Austin Phase 3?
Cousins Properties Incorporated is the property owner/developer of record for TikTok Austin Phase 3, per its TDLR project registration.
Who is the architect or design firm for TikTok Austin Phase 3?
Interior Architects is the design firm of record for TikTok Austin Phase 3, according to its TDLR filing.
How much does TikTok Austin Phase 3 cost and how big is it?
TikTok Austin Phase 3 has an estimated construction value of $350K and approximately 2,110 square feet (about $166/sqft), based on its TDLR filing.
Scope of Work
TENANT IMPROVEMENT ON FLOOR 32 TO CONVERT RECEPTIONIST AREA TO OFFICE SPACE. INCLUDING MINOR DEMOLITION AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, CEILINGS, FINISHES AND FURNITURE/EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. NO NEW ACCESS CONTROL,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
300 Colorado Street Level 32, Austin, TX, 78701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$581.2M totalRelated City Permits
Building permits found at or near this location
Disconnect existing service and place on T-Poel for construction
BASE: Installing a backup battery system and additional meter socket.
Temp power for 3008 Davis Ln #230 ref 2026-123268 BP
Trench and replace sewer yard line from cleanout out to city tap.
Replacing a section of sewer line in customers yard.
Watch all construction in 78701 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.