Funding type
This project is privately funded, on private land for private use.
Inframark LLC Tenant Finish-out Phase 2 in Forney, TX
9558 Helms Trail Suite 200, Forney, TX, 75126
Inframark LLC Tenant Finish-out Phase 2 is a renovation/alteration project at 9558 Helms Trail Suite 200, Forney, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $259K across about 2,500 sq ft.
- Estimated project value
- $259K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $104/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Inframark LLC Tenant Finish-out Phase 2
Inframark LLC Tenant Finish-out Phase 2 is a renovation project located at 9558 Helms Trail Suite 200 in Forney, Texas. The filing describes the work as an expansion of tenant lease space within an existing pre-engineered metal building warehouse facility. The project involves 2,500 square feet of alteration work with an estimated cost of $259,000.
The owner of record is Helms Trail Properties, Inc. C/O The Ware Holdings. Broadstone Design Group is the registered design firm for this specific filing. Fred Dwain Cawyer is listed as the registered accessibility specialist. The project is privately funded on private land for private use.
Timeline and Status
The project was registered with TDLR in November 2024 with a target completion date of June 2025. Construction start was scheduled for December 2024. However, no plan review or inspection has been recorded since registration. Consequently, whether the construction proceeded as planned is not confirmed in the public record.
In Kaufman County, the median estimated cost for similar renovation and alteration filings is $250,000. This project’s cost of $259,000 is close to that county median. The median size for these filings is 3,450 square feet, while this project is 2,500 square feet. The median cost per square foot is $100, making the $104 per square foot for this project close to the average. The scheduled build window of 182 days is longer than the county median of 96 days.
Helm Trail Properties, Inc. C/O The Ware Holdings has one other TDLR-registered project in Forney for Helms Trail Industrial Park, which is closed. Broadstone Design Group has six other registered projects totaling $2,703,251, including locations for FedEx and Circle K. The surrounding area includes businesses such as Premier Accessible Van Rental and Subway.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75126 (Forney)
One email per change. Unsubscribe in one click. Privacy.
Inframark LLC Tenant Finish-out Phase 2 is a Renovation/Alteration project located at 9558 Helms Trail Suite 200, Forney, TX 75126 in Forney, Texas. The project has an estimated value of $259K covering 2,500 sq ft. Helms Trail Properties, Inc. C/O The Ware Holdings is the property owner and Broadstone Design Group is the design firm of record. The project was registered with TDLR on November 1, 2024.
Frequently Asked Questions
Is Helms Trail Industrial Park finished?
The target completion date was June 2025, but no plan review or inspection has been recorded, so completion is not confirmed in the public record.
Who is the owner of this project?
The owner of record is Helms Trail Properties, Inc. C/O The Ware Holdings.
What is the scope of the work?
The scope is the expansion of tenant lease space in an existing pre-engineered metal building warehouse facility.
What is Inframark LLC Tenant Finish-out Phase 2?
Inframark LLC Tenant Finish-out Phase 2 is a renovation/alteration project at 9558 Helms Trail Suite 200 in Forney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion of tenant lease space in existing pre-engineered metal building warehouse facility.
Is Inframark LLC Tenant Finish-out Phase 2 open in Forney?
Inframark LLC Tenant Finish-out Phase 2 was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Inframark LLC Tenant Finish-out Phase 2 located?
Inframark LLC Tenant Finish-out Phase 2 is located at 9558 Helms Trail Suite 200, Forney, TX, 75126, in Kaufman County.
Who is the owner or developer of Inframark LLC Tenant Finish-out Phase 2?
Helms Trail Properties, Inc. C/O The Ware Holdings is the property owner/developer of record for Inframark LLC Tenant Finish-out Phase 2, per its TDLR project registration.
Who is the architect or design firm for Inframark LLC Tenant Finish-out Phase 2?
Broadstone Design Group is the design firm of record for Inframark LLC Tenant Finish-out Phase 2, according to its TDLR filing.
How much does Inframark LLC Tenant Finish-out Phase 2 cost and how big is it?
Inframark LLC Tenant Finish-out Phase 2 has an estimated construction value of $259K and approximately 2,500 square feet (about $104/sqft), based on its TDLR filing.
Scope of Work
Expansion of tenant lease space in existing pre-engineered metal building warehouse facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
9558 Helms Trail Suite 200, Forney, TX, 75126
Related Projects
Same Owner
$632K totalWatch all construction in 75126 (Forney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Forney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.