Project intelligenceTDLR TABS2025005088New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Taylor Road (CBJ 921-02-328 in Mission, TX

From Bus 83 to Mile 2 North Rd., Mission, TX, 78572

Opening ~Aug 2027Project Registered

Taylor Road (CBJ 921-02-328 is a new construction project at From Bus 83 to Mile 2 North Rd., Mission, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $16.2M across about 51,600 sq ft.

Estimated project value
$16.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
51,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$314/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 7, 2024998 days across supplied datesAug 2, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    267 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    731 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Taylor Road (CBJ 921-02-328

Taylor Road (CBJ 921-02-328) is a new construction project in Mission, TX 78572, involving the reconstruction and widening of a nonfreeway city street from Bus 83 to Mile 2 North Rd. The scope includes grading, new pavement structure, drain sewer, signage, and striping. The estimated cost for this work is $16,226,832.

L&G Engineering Consultants serves as the design firm of record, with Anthony Covacevich listed as the registered accessibility specialist. The project was registered with TDLR in November 2024, and plan review is pending. Construction is scheduled to begin in August 2025, with completion targeted for August 2027.

Project Scale and Cost Context

With an estimated size of 51,600 sq ft, the project has a computed cost of $314 per square foot. Among 2,701 TDLR-registered new construction filings in Hidalgo County, this project's cost is above the county median for its type, placing it in the top quarter. The scheduled build window of 731 days is longer than the county median of 212 days for similar projects.

The City of Mission has six other TDLR-registered projects totaling $1,137,392, including intersections on Mile 2 and Conway and 1st St. L&G Engineering Consultants is also the design firm for three other registered projects totaling $23,876,347, including work on Liberty Blvd. and Taylor Rd. to FM 2220 Ware Rd. This project involves public funds and is a Federally funded roadway project.

The surrounding area in ZIP code 78572 has a population of about 78,197 and a median household income of $54,029, according to U.S. Census ACS 2023 five-year estimates. The median owner-occupied home value in this ZIP code is $121,900, with housing predominantly owner-occupied. Hidalgo County unemployment rate was 6.3 percent in August 2026, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78572 (Mission)

One email per change. Unsubscribe in one click. Privacy.

Taylor Road (CBJ 921-02-328 is a New Construction project located at From Bus 83 to Mile 2 North Rd., Mission, TX 78572 in Mission, Texas. The project has an estimated value of $16.2M covering 51,600 sq ft. City of Mission is the property owner and L&G Engineering Consultants is the design firm of record. The project was registered with TDLR on November 7, 2024.

Frequently Asked Questions

When is the Taylor Road project expected to be finished?

The project is targeted for August 2027. Construction is scheduled to start in August 2025, following a registration with TDLR in November 2024.

Who is the owner of this construction project?

The City of Mission is the owner and developer of record for the Taylor Road (CBJ 921-02-328) reconstruction and widening project.

What is the estimated cost of the project?

The estimated cost is $16,226,832. This figure is above the county median for new construction filings in Hidalgo County.

Is the project currently under construction?

Plan review is pending. The filing indicates construction start is scheduled for August 2025, so active construction has not yet begun.

Who is the design firm for this project?

L&G Engineering Consultants is the registered design firm of record for the Taylor Road (CBJ 921-02-328) project in Mission.

What is Taylor Road (CBJ 921-02-328?

Taylor Road (CBJ 921-02-328 is a new construction project at From Bus 83 to Mile 2 North Rd. in Mission, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen a nonfreeway city street consisting of grading, new pavement structure, drain sewer, signage and striping.

Is Taylor Road (CBJ 921-02-328 open in Mission?

Taylor Road (CBJ 921-02-328 is still under construction in Mission, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Taylor Road (CBJ 921-02-328 located?

Taylor Road (CBJ 921-02-328 is located at From Bus 83 to Mile 2 North Rd., Mission, TX, 78572, in Hidalgo County.

Who is the owner or developer of Taylor Road (CBJ 921-02-328?

City of Mission is the property owner/developer of record for Taylor Road (CBJ 921-02-328, per its TDLR project registration.

Who is the architect or design firm for Taylor Road (CBJ 921-02-328?

L&G Engineering Consultants is the design firm of record for Taylor Road (CBJ 921-02-328, according to its TDLR filing.

How much does Taylor Road (CBJ 921-02-328 cost and how big is it?

Taylor Road (CBJ 921-02-328 has an estimated construction value of $16.2M and approximately 51,600 square feet (about $314/sqft), based on its TDLR filing.

Scope of Work

Reconstruct and widen a nonfreeway city street consisting of grading, new pavement structure, drain sewer, signage and striping.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From Bus 83 to Mile 2 North Rd., Mission, TX, 78572

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78572 (Mission)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.