Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Liberty Blvd II (Mile 3 to FM2221) in Mission, TX
Various, Mission, TX, 78577
Liberty Blvd II (Mile 3 to FM2221) is a renovation/alteration project at Various, Mission, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $8.3M across about 2,312,640 sq ft.
- Estimated project value
- $8.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,312,640 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $4/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
281 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
356 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Liberty Blvd II (Mile 3 to FM2221)
Liberty Blvd II (Mile 3 to FM2221) is a renovation and alteration project in Mission, Texas, involving the reconstruction of 3.65 miles of right-of-way improvements and non-freeway facilities. The project is registered with TDLR and is targeted for November 2026, following a start date of November 2025.
Project Scope and Scale
The filing describes the work as covering 2,312,640 square feet of improvements. With an estimated cost of $8,328,783, the project represents a significant infrastructure investment for Hidalgo County. The cost per square foot is calculated at $4, which is below the county median of $70 for similar renovation and alteration filings in the area.
Hidalgo County Precinct 3 is the owner of record for this roadway project. L&G Engineering Consultants serves as the design firm, a firm that has three other TDLR-registered projects in the region totaling over $31 million. Anthony Covacevich is the registered accessibility specialist associated with the filing. The project involves public funds and is classified as a Federally funded roadway project.
Timeline and Status
The project was registered with TDLR in February 2025. Plan review is pending, and the scheduled build window is 356 days. This duration is longer than the county median of 92 days for similar projects. The estimated cost is above the county median for this type of work, placing it in the top quarter of recent filings in Hidalgo County.
Construction is set to begin in November 2025, with the completion date on the filing set for November 2026. The project status is listed as Project Registered. The address is listed as Various locations within Mission, ZIP code 78577. This area has a population of approximately 79,903 people according to U.S. Census estimates for the ZIP code.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78577 (Mission)
One email per change. Unsubscribe in one click. Privacy.
Liberty Blvd II (Mile 3 to FM2221) is a Renovation/Alteration project located at Various, Mission, TX 78577 in Mission, Texas. The project has an estimated value of $8.3M covering 2,312,640 sq ft. Hidalgo County- Prec 3 is the property owner and L&G Engineering Consultants is the design firm of record. The project was registered with TDLR on February 21, 2025.
Frequently Asked Questions
What is the estimated cost of the Liberty Blvd II project?
The estimated cost for the Liberty Blvd II renovation and alteration project is $8,328,783. This figure is derived from the TDLR filing for the 3.65 miles of improvements in Mission.
When is the project targeted for completion?
The project is targeted for November 2026. Construction is scheduled to start in November 2025, with a build window of 356 days as noted in the registration.
Who is the owner of record for this roadway project?
Hidalgo County Precinct 3 is the owner of record. The design firm is L&G Engineering Consultants, and Anthony Covacevich is the registered accessibility specialist.
How large is the scope of work in square footage?
The scope of work covers 2,312,640 square feet. This includes new right-of-way improvements and the reconstruction of non-freeway facilities along Liberty Boulevard in Mission.
What is Liberty Blvd II (Mile 3 to FM2221)?
Liberty Blvd II (Mile 3 to FM2221) is a renovation/alteration project at Various in Mission, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 3.65 of new ROW improvements and reconstruction of non freeway facility.
Is Liberty Blvd II (Mile 3 to FM2221) open in Mission?
Liberty Blvd II (Mile 3 to FM2221) is still under construction in Mission, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Liberty Blvd II (Mile 3 to FM2221) located?
Liberty Blvd II (Mile 3 to FM2221) is located at Various, Mission, TX, 78577, in Hidalgo County.
Who is the owner or developer of Liberty Blvd II (Mile 3 to FM2221)?
Hidalgo County- Prec 3 is the property owner/developer of record for Liberty Blvd II (Mile 3 to FM2221), per its TDLR project registration.
Who is the architect or design firm for Liberty Blvd II (Mile 3 to FM2221)?
L&G Engineering Consultants is the design firm of record for Liberty Blvd II (Mile 3 to FM2221), according to its TDLR filing.
How much does Liberty Blvd II (Mile 3 to FM2221) cost and how big is it?
Liberty Blvd II (Mile 3 to FM2221) has an estimated construction value of $8.3M and approximately 2,312,640 square feet (about $4/sqft), based on its TDLR filing.
Scope of Work
3.65 of new ROW improvements and reconstruction of non freeway facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Various, Mission, TX, 78577
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$8.3M totalWatch all construction in 78577 (Mission)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mission?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.