Project intelligenceTDLR TABS2025005422New Construction
Funding type

This project is privately funded, on private land for private use.

Eastland Phase 5 in Crandall, TX

Approx 500 ft Northeast of CR 269 & FM 741, Crandall, TX, 75114

Target date passed (Aug 2026)Review Complete

Eastland Phase 5 is a new construction project at Approx 500 ft Northeast of CR 269 & FM 741, Crandall, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $22.1M across about 7,000 sq ft.

Estimated project value
$22.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.15K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 12, 2024627 days across supplied datesAug 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    535 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Eastland Phase 5

Eastland Phase 5 is a new construction project in Kaufman County, Texas, scheduled to build public infrastructure for a single-family residential development. The site is located approximately 500 feet northeast of the intersection of CR 269 and FM 741 in Crandall, TX 75114. The scope of work includes 7,000 linear feet of sidewalk and 98 curb ramps. The total estimated cost for this public infrastructure package is $22,062,000.

Project Ownership and Design

Lennar Homes of Texas Land & Construction, LTD is the owner of record for this development. LJA Engineering, Inc. serves as the design firm of record, responsible for the engineering aspects of the project. Jeffery L Kelley is the registered accessibility specialist listed in the TDLR filing. The project is privately funded on private land for private use, meaning it is not a municipal government project despite the infrastructure nature of the scope.

The TDLR registration for Eastland Phase 5 was completed in November 2024, with plan review also finishing in that same month. Construction was scheduled to begin in May 2026 and finish in August 2026. Although the scheduled completion date of August 2026 has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project status in the TDLR system remains Review Complete.

This project is situated in ZIP code 75114, an area with a population of about 7,664 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $88,839, and the median owner-occupied home value is $275,100. A bid tabulation document from LJA Engineering confirms the construction of paving improvements for Eastland, Phase 5 in Crandall.

The estimated cost of $22,062,000 is above the Kaufman County median for new construction filings, which stands at $1,200,000. The scheduled build window of 92 days is shorter than the county median of 242 days. The cost per square foot, calculated at $3,152, is significantly above the county median of $145 per square foot. Lennar Homes of Texas Land & Construction, LTD has six other TDLR-registered projects totaling $10,065,822 across Texas, including locations in Celina, New Braunfels, Fort Worth, and Ennis.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75114 (Crandall)

One email per change. Unsubscribe in one click. Privacy.

Eastland Phase 5 is a New Construction project located at Approx 500 ft Northeast of CR 269 & FM 741, Crandall, TX 75114 in Crandall, Texas. The project has an estimated value of $22.1M covering 7,000 sq ft. Lennar Homes of Texas Land & Construction, LTD is the property owner and LJA Engineering, Inc. is the design firm of record. The project was registered with TDLR on November 12, 2024.

Frequently Asked Questions

Is Eastland Phase 5 open for business?

The TDLR record shows construction was scheduled to finish in August 2026, but TDLR has not yet recorded a final inspection. Therefore, the current operational status is not confirmed in the public record.

Who is building Eastland Phase 5 in Crandall?

Lennar Homes of Texas Land & Construction, LTD is the owner of record. LJA Engineering, Inc. is the design firm, and Jeffery L Kelley is the registered accessibility specialist.

What is the scope of work for Eastland Phase 5?

The project involves new construction of public infrastructure, specifically 7,000 linear feet of sidewalk and 98 curb ramps, to support a single-family residential development.

What is the estimated cost of the project?

The estimated cost for Eastland Phase 5 is $22,062,000. This figure covers the public infrastructure components of the single-family residential project.

When was the project registered with TDLR?

The project was registered with TDLR in November 2024. Plan review was also completed in November 2024, and construction was scheduled to start in May 2026.

What is Eastland Phase 5?

Eastland Phase 5 is a new construction project at Approx 500 ft Northeast of CR 269 & FM 741 in Crandall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Single Family Residential project to build public infrastructure including 7,000 linear feet of sidewalk and 98 curb ramps

Is Eastland Phase 5 open in Crandall?

Eastland Phase 5 was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Eastland Phase 5 located?

Eastland Phase 5 is located at Approx 500 ft Northeast of CR 269 & FM 741, Crandall, TX, 75114, in Kaufman County.

Who is the owner or developer of Eastland Phase 5?

Lennar Homes of Texas Land & Construction, LTD is the property owner/developer of record for Eastland Phase 5, per its TDLR project registration.

Who is the architect or design firm for Eastland Phase 5?

LJA Engineering, Inc. is the design firm of record for Eastland Phase 5, according to its TDLR filing.

How much does Eastland Phase 5 cost and how big is it?

Eastland Phase 5 has an estimated construction value of $22.1M and approximately 7,000 square feet (about $3.15K/sqft), based on its TDLR filing.

Scope of Work

Single Family Residential project to build public infrastructure including 7,000 linear feet of sidewalk and 98 curb ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Approx 500 ft Northeast of CR 269 & FM 741, Crandall, TX, 75114

32.60164, -96.33751

Watch all construction in 75114 (Crandall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Crandall?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.