Alexander Section 3 Landscape Improvements in Pearland, TX
Main Street (State HWY 35) & English Lake Drive, Pearland, TX, 77581
Alexander Section 3 Landscape Improvements is a new construction project at Main Street (State HWY 35) & English Lake Drive, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $679K across about 245,000 sq ft.
- Estimated project value
- $679K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 245,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $3/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
102 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
112 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Alexander Section 3 Landscape Improvements
Construction of the Alexander Section 3 Landscape Improvements project is registered at the intersection of Main Street (State HWY 35) and English Lake Drive in Pearland, Texas. The filing specifies a new construction scope covering 245,000 square feet of site improvements, including sidewalks, trees, shrubs, fine grading, and hydromulch. The estimated cost for this work is $679,370.
277 Danzinger Investments is the owner of record for this development phase. KGA DeForest Design is listed as the design firm responsible for the project specifications. Jeromy G Murphy serves as the registered accessibility specialist associated with the TDLR filing. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in December 2024, with a target completion date of July 2025.
According to the public record, no plan review or inspection has been recorded since the initial registration. The scheduled build window was 112 days, which is shorter than the median scheduled build window of 222 days for similar new construction projects in Brazoria County. The estimated cost of $679,370 is below the county median of $800,000 for this type of work. The cost per square foot is computed at $3, which is below the county median of $119 per square foot.
277 Danzinger Investments has three other TDLR-registered projects in Pearland, including Alexander Section 2 Landscape Improvements and Alexander South Detention Pond. KGA DeForest Design has six other registered projects across the region, including landscape improvements in Cypress and Katy. The project involves public funds, public land, or is a Federally funded roadway project, as noted in the filing details.
The area around ZIP code 77581 has a population of about 50,240, with a median household income of $106,556. Median owner-occupied home value in this Census area is $309,100. Other registered projects in the immediate vicinity include Creative World School Pearland and Kingdom Hall of Jehovah's Witnesses. The Brazoria County unemployment rate was 5.1 percent in August 2026, lower than a year earlier.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77581 (Pearland)
One email per change. Unsubscribe in one click. Privacy.
Alexander Section 3 Landscape Improvements is a New Construction project located at Main Street (State HWY 35) & English Lake Drive, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $679K covering 245,000 sq ft. 277 Danzinger Investments is the property owner and KGA DeForest Design is the design firm of record. The project was registered with TDLR on December 5, 2024.
Frequently Asked Questions
What is the current status of the Alexander Section 3 project?
The project was registered in December 2024 with a target completion of July 2025. No plan review or inspection has been recorded in the public record, so completion is not confirmed.
Who is the owner and designer of this project?
277 Danzinger Investments is the owner of record. KGA DeForest Design is the design firm of record, and Jeromy G Murphy is the registered accessibility specialist.
What does the scope of work include?
The scope includes new construction of sidewalks, trees, shrubs, fine grading, and hydromulch across 245,000 square feet of land at Main Street and English Lake Drive.
Is the project located in Pearland?
Yes, the project is located at Main Street (State HWY 35) & English Lake Drive in Pearland, Texas 77581, within Brazoria County.
How does the cost compare to other local projects?
The estimated cost of $679,370 is below the Brazoria County median of $800,000 for similar new construction filings. The $3 per square foot cost is below the county median of $119.
What is Alexander Section 3 Landscape Improvements?
Alexander Section 3 Landscape Improvements is a new construction project at Main Street (State HWY 35) & English Lake Drive in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, trees, shrubs, fine grading, & hydromulch
Is Alexander Section 3 Landscape Improvements open in Pearland?
Alexander Section 3 Landscape Improvements was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Alexander Section 3 Landscape Improvements located?
Alexander Section 3 Landscape Improvements is located at Main Street (State HWY 35) & English Lake Drive, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of Alexander Section 3 Landscape Improvements?
277 Danzinger Investments is the property owner/developer of record for Alexander Section 3 Landscape Improvements, per its TDLR project registration.
Who is the architect or design firm for Alexander Section 3 Landscape Improvements?
KGA DeForest Design is the design firm of record for Alexander Section 3 Landscape Improvements, according to its TDLR filing.
How much does Alexander Section 3 Landscape Improvements cost and how big is it?
Alexander Section 3 Landscape Improvements has an estimated construction value of $679K and approximately 245,000 square feet (about $3/sqft), based on its TDLR filing.
Scope of Work
Sidewalks, trees, shrubs, fine grading, & hydromulch
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Main Street (State HWY 35) & English Lake Drive, Pearland, TX, 77581
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.4M totalWatch all construction in 77581 (Pearland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pearland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.