Alexander Section 3 Landscape Improvements in Pearland, TX
Intersection of English Lake Dr. & Ripe Meadow Way, Pearland, TX, 77581
Alexander Section 3 Landscape Improvements is a new construction project at Intersection of English Lake Dr. & Ripe Meadow Way, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $679K across about 382,000 sq ft.
- Estimated project value
- $679K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 382,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 9 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
67 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
258 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
89 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Alexander Section 3 Landscape Improvements
The Alexander Section 3 project in Pearland is complete. This new construction site, located at the intersection of English Lake Dr. and Ripe Meadow Way, passed its final TDLR accessibility inspection in June 2026. The TDLR record lists the status as Inspection Complete, confirming that the physical work described in the filing has been finished.
The project scope focuses entirely on landscape and site improvements rather than structural building development. The filing lists sidewalks, planting, irrigation, site furniture, fine grading, and hydromulch as the primary components. This aligns with the project name on the filing, Alexander Section 3 Landscape Improvements, which indicates a specialized focus on outdoor infrastructure within the development.
Project Scale and Cost
The site covers 382,000 sq ft. The estimated cost for this work was $679,370, resulting in a cost of $2 per sq ft. This figure is significantly below the county median of $119 per sq ft for new construction filings in Brazoria County. The scheduled build window was 258 days, which is close to the county median of 221 days for similar projects.
277 Danzinger Investments is the owner of record for this project. This entity has three other TDLR-registered projects in Pearland, including Alexander Section 2 Landscape Improvements and Alexander South Detention Pond. KGA DeForest Design, LLC served as the design firm of record. Jeromy G Murphy is the registered accessibility specialist associated with the filing.
The project involves public funds, public land, or is a Federally funded roadway project. It was registered with TDLR in May 2025, with plan review completed in the same month. Construction started in July 2025, and the completion date on the filing was March 2026. The final inspection passed in June 2026, marking the end of the construction phase for this specific scope of work.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77581 (Pearland)
One email per change. Unsubscribe in one click. Privacy.
Alexander Section 3 Landscape Improvements is a New Construction project located at Intersection of English Lake Dr. & Ripe Meadow Way, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $679K covering 382,000 sq ft. 277 Danzinger Investments is the property owner and KGA DeForest Design, LLC is the design firm of record. The project was registered with TDLR on May 9, 2025.
Frequently Asked Questions
Is the Alexander Section 3 project finished?
Yes, the project is complete. It passed its final TDLR accessibility inspection in June 2026, and the TDLR status is listed as Inspection Complete.
What work was included in this project?
The scope of work included sidewalks, planting, irrigation, site furniture, fine grading, and hydromulch. It was classified as new construction focused on landscape improvements.
Who is the owner of this project?
277 Danzinger Investments is the owner of record. The design firm of record is KGA DeForest Design, LLC.
How large is the project site?
The project covers 382,000 sq ft. The estimated cost was $679,370, which equates to $2 per square foot.
Where is the project located?
The project is located at the intersection of English Lake Dr. and Ripe Meadow Way in Pearland, TX 77581, within Brazoria County.
What is Alexander Section 3 Landscape Improvements?
Alexander Section 3 Landscape Improvements is a new construction project at Intersection of English Lake Dr. & Ripe Meadow Way in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, Planting, Irrigation, Site Furniture, Fine Grading, & Hydromulch
Is Alexander Section 3 Landscape Improvements open in Pearland?
Construction on Alexander Section 3 Landscape Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Alexander Section 3 Landscape Improvements located?
Alexander Section 3 Landscape Improvements is located at Intersection of English Lake Dr. & Ripe Meadow Way, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of Alexander Section 3 Landscape Improvements?
277 Danzinger Investments is the property owner/developer of record for Alexander Section 3 Landscape Improvements, per its TDLR project registration.
Who is the architect or design firm for Alexander Section 3 Landscape Improvements?
KGA DeForest Design, LLC is the design firm of record for Alexander Section 3 Landscape Improvements, according to its TDLR filing.
How much does Alexander Section 3 Landscape Improvements cost and how big is it?
Alexander Section 3 Landscape Improvements has an estimated construction value of $679K and approximately 382,000 square feet (about $2/sqft), based on its TDLR filing.
Scope of Work
Sidewalks, Planting, Irrigation, Site Furniture, Fine Grading, & Hydromulch
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Intersection of English Lake Dr. & Ripe Meadow Way, Pearland, TX, 77581
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.4M totalWatch all construction in 77581 (Pearland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pearland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.