DELL PC1 OCS P
๐Project Metrics
TDLR #TABS2025007181Review Complete
Design review complete, construction may proceed
๐Scope of Work
MEP Systems Upgrade, new server racks, hot aisle containment. Construction of a new Exterior MEP Equipment Yard in parking lot. Interior Scope includes converting a portion of the existing mezzanine level to mechanical equipment space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$16.3M total๐๏ธSame Design Firm
$10.5M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Addition/remodel. Addition of an office utility room half bathroom expanded living room and covered patio to rear of existing 1-story single family residence. Interior remodel. Reconfigure interior layout and relocate kitchen. Addition/remodel will result in a 3 bedroom 2.5 bathroom single family residence.
Home: New construction of 2 story detached dwelling unit 3 bed 2.5 bath with attached garage
Unit A: Rev meter 7269812 Work complete need second permit since this is a duplex. First permit for Unit B is 25-020847
Replacement of an existing water heater Larry Chapman: Replace 50-gal unit water heater (like-for-like)
Debbs - 3925803 - Install new 5.76 kW rooftop solar system to existing residential only using backfed breaker.
๐Related Site Plans
City of Austin site plan approvals at this location