DELL PC1 OCS P
DELL PC1 OCS P is a renovation/alteration project at 1404 Park Center Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $23.0M across about 40,500 sq ft.
๐Project Metrics
TDLR #TABS2025007181Review Complete
Design review complete, construction may proceed
DELL PC1 OCS P is a Renovation/Alteration project located at 1404 Park Center Drive, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $23.0M covering 40,500 sq ft. Dell Technologies is the property owner and Cushing Terrell is the design firm of record. The project was registered with TDLR on December 9, 2024.
โFrequently Asked Questions
What is DELL PC1 OCS P?
DELL PC1 OCS P is a renovation/alteration project at 1404 Park Center Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MEP Systems Upgrade, new server racks, hot aisle containment. Construction of a new Exterior MEP Equipment Yard in parking lot. Interior Scope includes converting a portion of the existing mezzanine level to mechanical equipment space.
Is DELL PC1 OCS P open in Austin?
DELL PC1 OCS P is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is DELL PC1 OCS P located?
DELL PC1 OCS P is located at 1404 Park Center Drive, Austin, TX, 78753, in Travis County.
Who is the owner or developer of DELL PC1 OCS P?
Dell Technologies is the property owner/developer of record for DELL PC1 OCS P, per its TDLR project registration.
Who is the architect or design firm for DELL PC1 OCS P?
Cushing Terrell is the design firm of record for DELL PC1 OCS P, according to its TDLR filing.
How much does DELL PC1 OCS P cost and how big is it?
DELL PC1 OCS P has an estimated construction value of $23.0M and approximately 40,500 square feet (about $568/sqft), based on its TDLR filing.
๐Scope of Work
MEP Systems Upgrade, new server racks, hot aisle containment. Construction of a new Exterior MEP Equipment Yard in parking lot. Interior Scope includes converting a portion of the existing mezzanine level to mechanical equipment space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 9, 2024
Review Complete
Dec 9, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$16.3M total๐๏ธSame Design Firm
$1.1M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Replacing like/like G water heater in garage.
Total demo of sfr 1362 sqft circa 1950
Electrical HVAC insulation drywall paint flooring carpet. The house was caught on fire and we are restoring it to pre-loss conditions
Tx gas has a leak on the gas main and is replacing the steel pipe with poly pipe and wants us to move the gas meter away from the tankless 10 away to be in compliance with the gas regulations.
Express: Foundation repair - installing 11 ext pilings