Project intelligenceTDLR TABS2025007680Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DISD: Dade Middle School Renovations in Dallas, TX

2727 Al Lipscomb Way, Dallas, TX, 75215

Construction complete · Nov 2026Inspection Complete

DISD: Dade Middle School Renovations is a renovation/alteration project at 2727 Al Lipscomb Way, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2026). The project has an estimated value of $658K across about 116,887 sq ft.

Estimated project value
$658K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
116,887 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 13, 2024689 days across supplied datesNov 2, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    306 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About DISD: Dade Middle School Renovations

Bill Earl Dade Middle School in Dallas has completed its renovation work at 2727 Al Lipscomb Way. The Dallas Independent School District owned this 116,887 sq ft facility, which underwent alterations to update critical infrastructure. The project included the installation of a new marque sign and the replacement of the fire alarm system. Kirksey Architecture served as the design firm of record, guiding the scope of work for this significant educational building.

Project Scale and Cost

The estimated cost for these renovations was $658,277. This figure places the project above the county median for renovation and alteration filings in Dallas County, where the middle half of projects ranged from $121,000 to $595,415. Despite the higher total cost, the cost per square foot was $6, which is below the county median of $73 per sq ft. The project involved public funds and public land, requiring strict adherence to accessibility standards.

Timeline and Inspection

Paul J Glenn served as the registered accessibility specialist for this filing, which was registered with TDLR in December 2024. Plan review was completed in December 2024, and construction began in January 2025. The scheduled completion date on the filing was December 2025. The building passed its final TDLR accessibility inspection in November 2026, so construction is complete. The TDLR status is now listed as Inspection Complete.

This renovation represents one of six projects registered to Dallas ISD, which collectively total $2,861,365. Other district projects include work at Victor H Hexter Elementary School and Arturo Salazar Elementary School. The area surrounding the school, within ZIP code 75215, has a median household income of $41,388 and is primarily renter-occupied. Dallas County unemployment was 3 percent in August 2026.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75215 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

DISD: Dade Middle School Renovations is a Renovation/Alteration project located at 2727 Al Lipscomb Way, Dallas, TX 75215 in Dallas, Texas. The project has an estimated value of $658K covering 116,887 sq ft. Dallas ISD is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on December 13, 2024.

Frequently Asked Questions

Is Bill Earl Dade Middle School open?

The TDLR record covers construction only and does not record whether the business has started serving customers.

Who designed the Bill Earl Dade Middle School renovation?

Kirksey Architecture served as the design firm of record for this project, overseeing the architectural plans for the renovation work.

What is the square footage of the project?

The facility covers 116,887 sq ft, which is significantly larger than the median size for similar projects in the county.

When did construction start?

Construction started in January 2025, following the completion of plan review in December 2024 and the project registration.

Who is the registered accessibility specialist?

Paul J Glenn is the registered accessibility specialist for this project, ensuring compliance with all required accessibility standards.

What is DISD: Dade Middle School Renovations?

DISD: Dade Middle School Renovations is a renovation/alteration project at 2727 Al Lipscomb Way in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New marque sign, Fire Alarm system replacement

Is DISD: Dade Middle School Renovations open in Dallas?

Construction on DISD: Dade Middle School Renovations is complete — TDLR records show the project passed its required accessibility inspection in Nov 2026. The building is finished and very likely open.

Where is DISD: Dade Middle School Renovations located?

DISD: Dade Middle School Renovations is located at 2727 Al Lipscomb Way, Dallas, TX, 75215, in Dallas County.

Who is the owner or developer of DISD: Dade Middle School Renovations?

Dallas ISD is the property owner/developer of record for DISD: Dade Middle School Renovations, per its TDLR project registration.

Who is the architect or design firm for DISD: Dade Middle School Renovations?

Kirksey Architecture is the design firm of record for DISD: Dade Middle School Renovations, according to its TDLR filing.

How much does DISD: Dade Middle School Renovations cost and how big is it?

DISD: Dade Middle School Renovations has an estimated construction value of $658K and approximately 116,887 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

New marque sign, Fire Alarm system replacement

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2727 Al Lipscomb Way, Dallas, TX, 75215

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75215 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.