Crockett High School Modernization Phase 1 is a renovation/alteration project at 5601 Manchaca Rd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $40.0M across about 10 sq ft.
Design review complete, construction may proceed
Crockett High School Modernization Phase 1 is a Renovation/Alteration project located at 5601 Manchaca Rd., Austin, TX 78745 in Austin, Texas. The project has an estimated value of $40.0M covering 10 sq ft. Austin Independent School District is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on December 16, 2024.
Crockett High School Modernization Phase 1 is a renovation/alteration project at 5601 Manchaca Rd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to Fine Arts spaces, music rooms, offices, and administration area. Secured vestibule. Proposed new Fine Arts shop building and proposed 2-story new athletics building, multipurpose gym with locker rooms, and coachesโฆ
Crockett High School Modernization Phase 1 is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Crockett High School Modernization Phase 1 is located at 5601 Manchaca Rd., Austin, TX, 78745, in Travis County.
Austin Independent School District is the property owner/developer of record for Crockett High School Modernization Phase 1, per its TDLR project registration.
Pfluger Architects is the design firm of record for Crockett High School Modernization Phase 1, according to its TDLR filing.
Crockett High School Modernization Phase 1 has an estimated construction value of $40.0M and approximately 10 square feet (about $4000.00K/sqft), based on its TDLR filing.
Interior renovations to Fine Arts spaces, music rooms, offices, and administration area. Secured vestibule. Proposed new Fine Arts shop building and proposed 2-story new athletics building, multipurpose gym with locker rooms, and coaches offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 16, 2024
Review Complete
May 1, 2026
Inspection Complete
Closed
501d
Review duration
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work *JILL KISSINGER: Remove existing vertical furnace and outdoor unit and install new like-for-like Goodman HVAC system; no structural change.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.