Crockett High School Modernization Phase 1
๐Project Metrics
TDLR #TABS2025007758Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Interior renovations to Fine Arts spaces, music rooms, offices, and administration area. Secured vestibule. Proposed new Fine Arts shop building and proposed 2-story new athletics building, multipurpose gym with locker rooms, and coaches offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.
Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Change Out: Install/ Replace 30 gallon electric tank-type water heater.
Rebuild service 200amp meter and panel
๐Related Site Plans
City of Austin site plan approvals at this location