Funding type
This project is privately funded, on private land for private use.
Elgin Elementary MEP Replacements
1005 W 2nd St, Elgin, TX, 78621
Elgin Elementary MEP Replacements is a renovation/alteration project at 1005 W 2nd St, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $815K across about 12,000 sq ft.
- Estimated project value
- $815K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $68/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
163 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
60 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
188 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78621 (Elgin)
One email per change. Unsubscribe in one click. Privacy.
Elgin Elementary MEP Replacements is a Renovation/Alteration project located at 1005 W 2nd St, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $815K covering 12,000 sq ft. Elgin Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 20, 2024.
Frequently Asked Questions
What is Elgin Elementary MEP Replacements?
Elgin Elementary MEP Replacements is a renovation/alteration project at 1005 W 2nd St in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolish all ductwork and HVAC units serving NW classroom wing. Replace all ductwork and units. New wall penetrations for new HVAC equipment.
Is Elgin Elementary MEP Replacements open in Elgin?
Elgin Elementary MEP Replacements was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Elgin Elementary MEP Replacements located?
Elgin Elementary MEP Replacements is located at 1005 W 2nd St, Elgin, TX, 78621, in Bastrop County.
Who is the owner or developer of Elgin Elementary MEP Replacements?
Elgin Independent School District is the property owner/developer of record for Elgin Elementary MEP Replacements, per its TDLR project registration.
Who is the architect or design firm for Elgin Elementary MEP Replacements?
O'Connell Robertson is the design firm of record for Elgin Elementary MEP Replacements, according to its TDLR filing.
How much does Elgin Elementary MEP Replacements cost and how big is it?
Elgin Elementary MEP Replacements has an estimated construction value of $815K and approximately 12,000 square feet (about $68/sqft), based on its TDLR filing.
Scope of Work
Demolish all ductwork and HVAC units serving NW classroom wing. Replace all ductwork and units. New wall penetrations for new HVAC equipment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1005 W 2nd St, Elgin, TX, 78621
Related Projects
Same Owner
$330.5M totalRelated City Permits
Building permits found at or near this location
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res [5 beds 6.5baths].
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath]. 1005 LINCOLN ST
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton two stage horizontal gas with 90% furnace
ePlan: Residential Expedited Review - New Pool. 1005 LINCOLN ST
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath]. 1005 LINCOLN ST
Watch all construction in 78621 (Elgin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Elgin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.