Project intelligenceTDLR TABS2025008294Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School

8407 Treehouse Ln, Elgin, TX, 78749

Target date passed (Jul 2025)Review Complete

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School is a renovation/alteration project at 8407 Treehouse Ln, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.0M across about 48,000 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
48,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$63/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 20, 2024411 days across supplied datesFeb 4, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    163 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    188 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78749 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School is a Renovation/Alteration project located at 8407 Treehouse Ln, Elgin, TX 78749 in Elgin, Texas. The project has an estimated value of $3.0M covering 48,000 sq ft. Elgin Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 20, 2024.

Frequently Asked Questions

What is Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School?

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School is a renovation/alteration project at 8407 Treehouse Ln in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace HVAC rooftop units and split systems, patch exterior wall at location of demolished duct penetration.

Is Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School open in Elgin?

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School located?

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School is located at 8407 Treehouse Ln, Elgin, TX, 78749, in Bastrop County.

Who is the owner or developer of Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School?

Elgin Independent School District is the property owner/developer of record for Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School, per its TDLR project registration.

Who is the architect or design firm for Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School?

O'Connell Robertson is the design firm of record for Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School, according to its TDLR filing.

How much does Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School cost and how big is it?

Elgin ISD 2025 HVAC Replacements - Elgin Intermediate School has an estimated construction value of $3.0M and approximately 48,000 square feet (about $63/sqft), based on its TDLR filing.

Scope of Work

Replace HVAC rooftop units and split systems, patch exterior wall at location of demolished duct penetration.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8407 Treehouse Ln, Elgin, TX, 78749

Location by street address

Related City Permits

Building permits found at or near this location

8407 SILVER RIDGE DR

New in-ground pool spa and concrete deck

FinalPlumbing PermitNewMay 2026
View Details
2026-030067 PP
Minnix Mechanical
8407 LORALINDA DR

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutMay 2026
View Details
2026-056368 MP
McCullough Heating & Air
8407 CAYUGA DR

Emergency breaker panel replacement no meter work being done. Install ground rods and surge protection device. Service Provider: Austin Energy

FinalElectrical PermitRepairApr 2026
View Details
2026-049856 EP
Mister Sparky Austin
8407 SILVER RIDGE DR

New in-ground pool spa and concrete deck

FinalElectrical PermitNewApr 2026
View Details
2026-030067 EP
Solid Base Electric, LLC
8407 FOREST HEIGHTS LN

Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT IN BACKYARD & 88K BTU FURNACE CHANGE-OUT IN ATTIC

ExpiredMechanical PermitChange OutApr 2026
View Details
2026-038502 MP
C & S Services

Watch all construction in 78749 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.