Project intelligenceTDLR TABS2025008652Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DISD TW Browne Middle School - Renovation

3333 Sprague Dr, Dallas, TX, 75233

Opening ~Aug 2027Review Complete

DISD TW Browne Middle School - Renovation is a renovation/alteration project at 3333 Sprague Dr, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $10.0M across about 129,000 sq ft.

Estimated project value
$10.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
129,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$78/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 2, 2025960 days across supplied datesAug 20, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    119 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    841 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About DISD TW Browne Middle School - Renovation

Dallas Independent School District is renovating TW Browne Middle School at 3333 Sprague Dr in the Oak Cliff neighborhood. The project, filed as DISD TW Browne Middle School - Renovation, covers 129,000 sq ft of existing space. TDLR completed plan review in January 2025 and construction is scheduled to finish in August 2027, with work starting May 2025.

The estimated cost for this renovation and alteration is $10,000,000. This places the project in the top quarter of estimated costs for similar filings in Dallas County, where the median is $248,000. The cost per square foot is $78, which is close to the county median of $72 for renovation and alteration projects.

KAI Design serves as the design firm of record for the project. The scope of work includes the replacement of all windows, demolition and rebuild of the entry vestibule, and partial interior renovation. Additional work involves replacing some interior finishes, some HVAC systems, lighting, and electrical rework.

Dallas ISD has six other TDLR-registered projects totaling $105,659,900 in the region. These include Obadiah Knight Elementary School in Dallas, valued at $42,459,900, and Dallas ISD Seagoville Elementary School, valued at $6,500,000. KAI Design has six other registered projects totaling $67,301,679, including Seagoville PK-8 in Dallas and L.V. Stockard Middle School in Dallas.

The project is registered with TDLR under the accessibility specialist Jack Randall Roseberry. Funding involves public funds, public land, or is a Federally funded roadway project. The scheduled build window of 841 days is longer than the county median of 92 days for this type of work. The site is near Sprague Athletic Complex and several local churches in the Oak Cliff area.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75233 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

DISD TW Browne Middle School - Renovation is a Renovation/Alteration project located at 3333 Sprague Dr, Dallas, TX 75233 in Dallas, Texas. The project has an estimated value of $10.0M covering 129,000 sq ft. Dallas Independent School District is the property owner and KAI Design is the design firm of record. The project was registered with TDLR on January 2, 2025.

Frequently Asked Questions

When will the renovation be completed?

Construction is scheduled to finish in August 2027. Work is set to start in May 2025, following the completion of plan review in January 2025.

What is the total estimated cost of the project?

The estimated cost for the renovation is $10,000,000. This figure is above the median estimated cost for renovation and alteration projects in Dallas County.

Who is the design firm for this project?

KAI Design is the design firm of record. They are also registered for other school projects in the Dallas and Seagoville areas.

Is the school open to the public during construction?

The TDLR record tracks construction status and does not indicate business operations. The project is scheduled to finish in August 2027.

What specific work is included in the renovation scope?

The scope includes replacing all windows, rebuilding the entry vestibule, and updating interior finishes, HVAC systems, lighting, and electrical systems.

What is DISD TW Browne Middle School - Renovation?

DISD TW Browne Middle School - Renovation is a renovation/alteration project at 3333 Sprague Dr in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation that includes replacement of all windows, demolition and rebuild of entry vestibule, replacement of some interior finishes, replacement of some HVAC systems, lighting replacement, electrical rework,. partial interior renovation

Is DISD TW Browne Middle School - Renovation open in Dallas?

DISD TW Browne Middle School - Renovation is still under construction in Dallas, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is DISD TW Browne Middle School - Renovation located?

DISD TW Browne Middle School - Renovation is located at 3333 Sprague Dr, Dallas, TX, 75233, in Dallas County.

Who is the owner or developer of DISD TW Browne Middle School - Renovation?

Dallas Independent School District is the property owner/developer of record for DISD TW Browne Middle School - Renovation, per its TDLR project registration.

Who is the architect or design firm for DISD TW Browne Middle School - Renovation?

KAI Design is the design firm of record for DISD TW Browne Middle School - Renovation, according to its TDLR filing.

How much does DISD TW Browne Middle School - Renovation cost and how big is it?

DISD TW Browne Middle School - Renovation has an estimated construction value of $10.0M and approximately 129,000 square feet (about $78/sqft), based on its TDLR filing.

Scope of Work

Renovation that includes replacement of all windows, demolition and rebuild of entry vestibule, replacement of some interior finishes, replacement of some HVAC systems, lighting replacement, electrical rework,. partial interior renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3333 Sprague Dr, Dallas, TX, 75233

Location by street address

Watch all construction in 75233 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.