Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
RISD - Berkner High School Mini Salon in Richardson, TX
1600 Spring Valley Rd., Richardson, TX, 75081
RISD - Berkner High School Mini Salon is a renovation/alteration project at 1600 Spring Valley Rd., Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $500K across about 800 sq ft.
- Estimated project value
- $500K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $625/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
138 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
78 days after the preceding date shown.
Source: TDLR filing
View source record
📰About RISD - Berkner High School Mini Salon
The Richardson Independent School District filed a TDLR registration for an approximately 800 sq ft interior refresh at Berkner High School, located at 1600 Spring Valley Rd. in Dallas County. The project, identified in the filing as the RISD - Berkner High School Mini Salon, is a renovation and alteration project with an estimated cost of $500,000. This figure equates to $625 per square foot, a rate that sits above the county median of $73 per square foot for similar renovation and alteration filings in Dallas County.
Glenn Partners is the design firm of record for this project. The district registered the work with TDLR in January 2025, establishing a scheduled build window of 78 days. This duration is close to the county median of 92 days for comparable projects. The registration indicates that the work involves public funds and public land, consistent with the district's role as the owner of record.
Construction Status and Record
The filing listed a target completion date of August 2025. However, no plan review or inspection has been recorded since the initial registration. Consequently, the public record does not confirm whether the work proceeded as scheduled or if the project has finished. The status remains listed as Project Registered in the TDLR database.
Richardson ISD has six other projects registered with TDLR, totaling $1,486,750,000. These include major constructions at Westwood Junior High School and Parkhill Junior High School. Glenn Partners, the design firm, also has six other registered projects totaling $332,548,108, including work at R.L. Turner High School and Richardson West Middle School. The presence of other registered projects in the immediate area, such as Collins Apartments and Buckingham Place, indicates active development in the Richardson 75081 ZIP code.
According to U.S. Census ACS 2023 five-year estimates, the 75081 ZIP code has a population of about 36,065 residents. The median household income is $90,953, and the median owner-occupied home value is $340,600. The housing stock in this area is an even mix of owner- and renter-occupied units. Nearby businesses include Richardson Square, Petco, and Target, placing the school site within a commercial corridor.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75081 (Richardson)
One email per change. Unsubscribe in one click. Privacy.
RISD - Berkner High School Mini Salon is a Renovation/Alteration project located at 1600 Spring Valley Rd., Richardson, TX 75081 in Richardson, Texas. The project has an estimated value of $500K covering 800 sq ft. Richardson ISD is the property owner and Glenn Partners is the design firm of record. The project was registered with TDLR on January 8, 2025.
Frequently Asked Questions
Is Berkner High School Mini Salon open?
The TDLR record shows no plan review or inspection has been recorded. The public record does not confirm whether the project is finished or if the business is operating.
Who is the owner of this project?
The owner of record is Richardson ISD. The project is a renovation and alteration of an existing facility at 1600 Spring Valley Rd.
What is the estimated cost of the renovation?
The estimated cost is $500,000. This amounts to $625 per square foot for the approximately 800 sq ft interior refresh.
Who designed the project?
Glenn Partners is the design firm of record for this TDLR-registered project. They are responsible for the design documentation associated with the filing.
When was the project registered?
The project was registered with TDLR in January 2025. The filing indicated a target completion date of August 2025.
What is RISD - Berkner High School Mini Salon?
RISD - Berkner High School Mini Salon is a renovation/alteration project at 1600 Spring Valley Rd. in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approx. 800 SF interior refresh
Is RISD - Berkner High School Mini Salon open in Richardson?
RISD - Berkner High School Mini Salon was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is RISD - Berkner High School Mini Salon located?
RISD - Berkner High School Mini Salon is located at 1600 Spring Valley Rd., Richardson, TX, 75081, in Dallas County.
Who is the owner or developer of RISD - Berkner High School Mini Salon?
Richardson ISD is the property owner/developer of record for RISD - Berkner High School Mini Salon, per its TDLR project registration.
Who is the architect or design firm for RISD - Berkner High School Mini Salon?
Glenn Partners is the design firm of record for RISD - Berkner High School Mini Salon, according to its TDLR filing.
How much does RISD - Berkner High School Mini Salon cost and how big is it?
RISD - Berkner High School Mini Salon has an estimated construction value of $500K and approximately 800 square feet (about $625/sqft), based on its TDLR filing.
Scope of Work
Approx. 800 SF interior refresh
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1600 Spring Valley Rd., Richardson, TX, 75081
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$495.7M totalWatch all construction in 75081 (Richardson)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Richardson?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.