Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
EPISD Campus Vestibules Region 3 24.555B
3307 N. Stanton Street, El Paso, TX, 79902
EPISD Campus Vestibules Region 3 24.555B is a renovation/alteration project at 3307 N. Stanton Street, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $75K across about 202 sq ft.
- Estimated project value
- $75K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 202 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $371/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
150 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79902 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
EPISD Campus Vestibules Region 3 24.555B is a Renovation/Alteration project located at 3307 N. Stanton Street, El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $75K covering 202 sq ft. El Paso Independent School District is the property owner. The project was registered with TDLR on January 16, 2025.
Frequently Asked Questions
What is EPISD Campus Vestibules Region 3 24.555B?
EPISD Campus Vestibules Region 3 24.555B is a renovation/alteration project at 3307 N. Stanton Street in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of access-controlled vestibule at campus main entry.
Is EPISD Campus Vestibules Region 3 24.555B open in El Paso?
EPISD Campus Vestibules Region 3 24.555B was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is EPISD Campus Vestibules Region 3 24.555B located?
EPISD Campus Vestibules Region 3 24.555B is located at 3307 N. Stanton Street, El Paso, TX, 79902, in El Paso County.
Who is the owner or developer of EPISD Campus Vestibules Region 3 24.555B?
El Paso Independent School District is the property owner/developer of record for EPISD Campus Vestibules Region 3 24.555B, per its TDLR project registration.
How much does EPISD Campus Vestibules Region 3 24.555B cost and how big is it?
EPISD Campus Vestibules Region 3 24.555B has an estimated construction value of $75K and approximately 202 square feet (about $371/sqft), based on its TDLR filing.
Scope of Work
Construction of access-controlled vestibule at campus main entry.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3307 N. Stanton Street, El Paso, TX, 79902
Watch all construction in 79902 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.